Development Application part 2 of 2 plans - MCU13/0080

of 68

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (51.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                     I’
3:May2013
18 Sunsee   r   Crose                                                                the certifier
combined- 0.5:1;
b) Precinct 83- 0.8;
c) Precinct E1- 0.6;
d) Precinct E2- 0.6;
e) Precinct E3- 0.6;
f) Precinct E4- 0.6;
g) Precinct E5- 0.6
h) Precinct E6- 0.6;
i) Precinct E7- 0.6;
j) Precinct RES- 0.6; and
k) Precinct REC/MU- 0.1.

017Buildings and other works        517.1 For new buildings or           517.1- The proposal complies
are designed and sited to-          structures or additions of more      with the designated minimum
a) provide flood free access to     than 50m2 gross floor area
                                                                         floor level of 2.6m AHD as
premises and .flood free            to an existing building or
                                                                         specified in the submitted
habitable areas;                    structure, floor levels for
                                    habitable rooms are not less         Flood Search provided by
b) allow only minor, short term
and infrequent flooding of non-     than the specified minimum floor     Sunshine Coast Council.
habitable areas;                    levels;
c) ensure carparking areas can      AND
                                                                         Proposal complies
be adequately drained;              517.2 Where Council
d) ensure drainage does not         infrastructure is available-
                                                                         517.2   -
                                                                                   The stormwater is
adversely impact upon other         a) any drainage (including
premises; and                       buildings and yards) flows to        capable of being directed to
e) ensure filling or excavation     that infrastructure; and             the lawful point of discharge
does not adversely impact upon      b) the infrastructure has the        on the street. Relevant

other premises by-                  capacity to accept any additional    conditions of approval can be
i. causing ponding on the site or   loading;                             included in the development
nearby land;                        AND
ii. increasing flooding, which      517.3 For Residential Uses-          permit.
adversely affects the safety or     a) where slab on ground
use of any land upstream and        construction is used, filling does   Proposal will comply
downstream; and                     not extend more than
iii. adversely affecting the flow   1 m beyond the building footprint    517.3   -
                                                                                   The lot is relatively flat
of water in any overland flow       and access to car parking areas,
                                                                         minimal fill will be required to
path.                               measured from the outer walls
                                                                         raise the level of the lot to
                                    of the building; or b) the design
                                    consists of a suspended floor        flood immunity for the

                                    construction;                        habitable rooms.
                                    AND
                                    517.4 Car parking and
                                                                         Proposal complies
                                    maneovering areas are
                                    constructed at a level that
                                    permits the parking area to drain
                                    from the site by gravity
                                    means, without the need for
                                    mechanical pumping;
                                    AND
                                    517.5 Basements for residential
                                    uses have flood   immunity above
                                    the Q 100 where alternative
                                    means to mechanical     pumping
                                    are used to achieve such

                                    immunity; or
                                    517.6 Basements for non-


                                                      18

Used in these records

About this file

File size
51.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 of 2 plans - MCU13_0080.pdf · 51.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.