standard ensuring that it does for casual surveillance of public be included in the
not lead to opportunities for and semi-public spaces,
development permit.
concealment and possible including entrances and
assault sites. exits to sites and buildings, by:
The proposal will comply.
a) planting trees which have
clean trunks to a height of at
least 1.8 m; and
b) appropriately spacing shrubs
at 1.2m horizontal centres, with
a maximum height of
O.75m, to avoid clumping and to
retain sightlines.
06 Street trees and plantings in S6.1 Street trees and trees in
towns and villages, carparks carparking areas achieve a
and other areas where maximum of 900mm clear trunk
potential conflicts with vehicles height for a 2.0m high tree at
and pedestrians are evident, planting and are able to
are planted so as to maximise attain a clear trunk height of
vehicle and pedestrian safety. 1900mm on maturity;
AND
S6.2 All scrub planting to be a
maximum height of
700mm from the road pavement
(not top of kerb).
Services and Utilities
07All landscaping works S7.1 Plant species used in The lot is not located near a
maintain adequate safe landscaping adjacent substation. Conditions related
distance from services and to substations, or adjacent to or
to planting under electricity
utilities including substations, on electricity transmission line
overhead powerlines, lines can be included in the
easements, are less than 4m
power poles and transformers, high at maturity and do not development permit.
street lamps, stormwater encroach within 3m of
catchment pits, and a substation boundary; The proposal will comply.
underground services and OR
utilities. S7.2 For trees higher than 4m,
trees are planted at a distance
from any part of an electricity
transmission line at least equal
to the expected height of the
tree at maturity (see Figure 14-
17);
AND
S7.3 For power lines that
connect to a premises, the
height of plant species at
maturity provides for a 2m
clearance below the power line;
(see Figure 14-18)
AND
S7.4 Trees and large scrubs are
located a minimum of-
a) 5m from electricity poles and
31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 plans - MCU13/0080Related documentApplication case desk ↗
About this file
- File size
- 51.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.