Appendix I - Local Planning response
habitat trees.
Lake Macdonald No solution provided. Not applicable
O12 Vegetation within 400m of the full ponded
water within Lake Macdonald is retained.
Steep slopes No solution provided. Not applicable
O13 Vegetation on steep slopes is retained and
managed to avoid erosion and landslide and to
protect natural resources and values.
Engineering and site works S14.1 Works, including roads, driveways, fences, sewer Complies
O14 Development is sited and designed to— lines and other infrastructure— No additional ground disturbance is proposed, apart
a) provide adequate separation distance between the a) do not transect areas of vegetation; or from landscaping works.
vegetation to be protected and the development b) are co-located within a combined utility corridor;
to avoid disturbing, destabilising and and
deoxygenating any tree or altering the drainage; c) provide for fauna underpasses, speed reduction
b) avoid traversing or fragmenting vegetation or devices and associated fencing, lighting and
habitats for significant flora or fauna species; and warning signs, where appropriate;
c) avoid creating barriers to faunal movement. AND
S14.2 Development within or adjacent to areas of
vegetation, incorporate fauna friendly fences;
AND
S14.3 Vegetation is protected from interference
resulting from clearing or construction activities by—
a) clearly marking vegetation to be retained with
flagging tape;
b) installing protective fencing around the dripline of
the vegetation and avoid filling and excavation in
these fenced areas; and
c) ensuring stock piling, storage and vehicle parking
occur outside the identified vegetation areas;
AND
S14.4 Low impact construction techniques are used
around vegetation to minimise interference with the
vegetation.
Filling and excavation No solution provided. Complies
O15 Vegetation is not adversely impacted upon by No additional ground disturbance is proposed, apart
earthworks and changes to the hydrological regime, from landscaping works.
including changes to ground water levels, flooding
levels, run-off and tidal hydraulics.
P a g e |6