Appendix I - Local Planning response
Vegetation management
Replanting and rehabilitation S16.1 Landscaping and rehabilitation complements and Complies
O16 Development provides for ecologically supports ecologically important habitats by— Existing vegetation on the subject site will be retained.
important areas to be restored and enhanced through a) utilising native plants of local origin; The proposed development will implement a
the following measures— b) utilising suitable plant species identified in PSP3 – landscaping design that uses fast-growing plants that are
a) siting landscaped areas to complement and Landscaping Plants and Guidelines; nominated in the Noosa Plan and are suitable for the
enhance existing vegetation; c) replicating adjacent remnant habitats, including River foreshore.
b) removal of all species likely to displace native flora understorey vegetation;
species or degrade fauna habitat; d) creating or enhancing linkages between existing
c) replanting and rehabilitating10 degraded habitat; habitats;
and e) avoiding the use of undesirable plant species listed
d) replacing any vegetation removed with suitable in Table 9.1 of PSP3 Landscaping Plants and
replacement vegetation of local origin. Guidelines; and
f) planting riparian zones to filter stormwater run-off
and provide for wildlife habitat;
AND
S16.2 Vegetation removed is replaced with—
a) plantings of equivalent area that replicate the
floristic structure of the vegetation removed; or
b) where this is not possible due to the characteristics
of the site and the development, plantings twice
the number of the removed trees and plants of
local origin.
Fire management No solution provided Complies
O17 Fire management measures are adopted based Fire management measures will be implemented in
on ecological principles, which— compliance with SO17.
a) maintain and enhance biodiversity;
b) minimise threat of fire to the natural environment,
life and property; and
c) provide for effective use and maintenance of
buildings and structures.
Clearing protected vegetation in the protected No solution provided Not applicable
vegetation overlay area The previous clearing of native vegetation
O18 Clearing protected vegetation does not on the site is exempt clearing work pursuant to the
involve— Planning Regulation 2017, schedule 21. The proposed
a) the removal of vegetation in ecologically important development does not involve the clearing of any.
areas;
b) removal of vegetation or habitat for fauna
identified or referred to as requiring protection in
10
Revegetation and rehabilitation works are to be carried out in accordance with an approved Revegetation and Rehabilitation Management Plan, as referred to in PSP18 Ecological Assessment Guidelines