Original source · versioned page text
Appendix I - Local Planning response
Column 1 Column 2 Assessment
Specific Outcomes Probable solutions
Hazardous materials S14.1 Materials manufactured or stored on-site are Complies
O14 Development avoids the release of hazardous not hazardous or noxious, or comprise materials that The risk of hazardous materials entering floodwaters
materials into floodwaters and the environment. may cause a detrimental effect on the environment if and the environment will be managed by:
discharged in a flood event; or • Moving transportable vessels and vehicles off the site
before high risk storm and tidal events;
S14.2 Structures used for the manufacture or storage • Ensuring any hazardous materials are stored off the
of hazardous materials are— ground and removing them from site before high risk
a) located above the defined flood level; or storm and tidal events.
b) designed to prevent the intrusion of
floodwaters11.
Essential network infrastructure S15.1 Components of the essential network Complies
O15 Essential network infrastructure (e.g. electricity, infrastructure that are likely to fail or may result in The proposal does not involve any material
water supply, sewerage and telecommunications) contamination when affected by flood water— intensification to services demand compared to the
maintains effective function during and immediately a) comply with Table 13.12; or previous operation at the site.
after flood events. b) are designed and constructed to exclude water
inundation or infiltration and resist hydrostatic and
hydrodynamic forces as a result of inundation.
O16 Community Uses and Infrastructure Uses are S16.1 Community Uses and Infrastructure Uses are Complies
able to function effectively during and immediately sited and constructed to ensure that floor levels comply The finished floor level of the shed is higher than the
after flood events. with flood immunity requirements specified in Table former boat shed and therefore achieves a higher level
13.12; of protection comparatively. There is no intensification
OR of the QFBP operation and the project does not involve
an increase in the exposure to the natural hazard.
S16.2 Essential community infrastructure which is
located below the specified flood immunity
requirements—
a) is designed and constructed to function effectively
during and immediately after the recommended
flood level flood event; and
b) has an emergency rescue area above the probable
maximum flood if it is for emergency services
(including emergency shelters, police facilities,
hospitals and associated facilities).
11
Refer to the Work Health and Safety Act 2011 and associated Regulation and Guidelines, the Environmental Protection Act 1994 and the relevant building assessment provisions under the Building Act 1975 for requirements related to the manufacture and
storage of hazardous substances.
P a g e | 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.