Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Appendix I - Local Planning response

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

  Column 1                                                                              Column 2                                                                             Assessment
  Specific Outcomes                                                                     Probable solutions
  Hazardous materials                                                                   S14.1 Materials manufactured or stored on-site are                                   Complies
  O14 Development avoids the release of hazardous                                       not hazardous or noxious, or comprise materials that                                 The risk of hazardous materials entering floodwaters
  materials into floodwaters and the environment.                                       may cause a detrimental effect on the environment if                                 and the environment will be managed by:
                                                                                        discharged in a flood event; or                                                      • Moving transportable vessels and vehicles off the site
                                                                                                                                                                             before high risk storm and tidal events;
                                                                                        S14.2 Structures used for the manufacture or storage                                 • Ensuring any hazardous materials are stored off the
                                                                                        of hazardous materials are—                                                          ground and removing them from site before high risk
                                                                                        a) located above the defined flood level; or                                         storm and tidal events.
                                                                                        b) designed to prevent the intrusion of
                                                                                             floodwaters11.
  Essential network infrastructure                                                      S15.1 Components of the essential network                                            Complies
  O15 Essential network infrastructure (e.g. electricity,                               infrastructure that are likely to fail or may result in                              The proposal does not involve any material
  water supply, sewerage and telecommunications)                                        contamination when affected by flood water—                                          intensification to services demand compared to the
  maintains effective function during and immediately                                   a) comply with Table 13.12; or                                                       previous operation at the site.
  after flood events.                                                                   b) are designed and constructed to exclude water
                                                                                             inundation or infiltration and resist hydrostatic and
                                                                                             hydrodynamic forces as a result of inundation.
  O16 Community Uses and Infrastructure Uses are                                        S16.1 Community Uses and Infrastructure Uses are                                     Complies
  able to function effectively during and immediately                                   sited and constructed to ensure that floor levels comply                             The finished floor level of the shed is higher than the
  after flood events.                                                                   with flood immunity requirements specified in Table                                  former boat shed and therefore achieves a higher level
                                                                                        13.12;                                                                               of protection comparatively. There is no intensification
                                                                                        OR                                                                                   of the QFBP operation and the project does not involve
                                                                                                                                                                             an increase in the exposure to the natural hazard.
                                                                                        S16.2 Essential community infrastructure which is
                                                                                        located below the specified flood immunity
                                                                                        requirements—
                                                                                        a) is designed and constructed to function effectively
                                                                                             during and immediately after the recommended
                                                                                             flood level flood event; and
                                                                                        b) has an emergency rescue area above the probable
                                                                                             maximum flood if it is for emergency services
                                                                                             (including emergency shelters, police facilities,
                                                                                             hospitals and associated facilities).




11
   Refer to the Work Health and Safety Act 2011 and associated Regulation and Guidelines, the Environmental Protection Act 1994 and the relevant building assessment provisions under the Building Act 1975 for requirements related to the manufacture and
storage of hazardous substances.


                                                                                                                                                                                                                                                    P a g e | 11
Log in to download the original file

Appendix I - Local Planning response.pdf · 522 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.