Council archive · source document
Approved Plans - EXE22-0013 · EXE22/0013
Plans and drawings: the text below has words only, no drawings.
Very large file (10.7 MB): may take a few minutes to open.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
Waste Water & Storm water
The site is connected to the mains sewer and storm water systems. All outflows are to be
directed to these mains.
Storage tanks should be watertight and adequately founded. Overflows are to be piped to
the existing storm water system.
7.5 Erosion Control & Landscape
Control erosion as this may lead to instability.
Slope protection measures shall be carried out on exposed batters in order to mitigate the
development of stability and erosion issues. These works shall be carried out in a timely
fashion after the batter is exposed.
Re‐vegetate exposed with shrubs, grasses and ground covers preferably with plants
indigenous to the local area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - EXE22-0013Related documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.