8.0 COMPLIANCE CERTIFICATION
For final building approvals, a compliance certificate may be required by the local authority to assess
that the relevant slope aspects of the development have been constructed in accordance with the
recommendations contained within this report.
In the event that a this certificate is required and as good practise in general, site inspections by STA
Consulting should be carried out at various stages of the development. This shall include, as a
minimum:
1. Site preparation works prior to building construction. This may include inspection on
topsoil stripping, cut and fill batters (temporary and/or permanent), drainage
measures etc.. This inspection would enable the identification of areas of
geotechnical concerns at the early stage of development.
2. Work Completion. This inspection is expected to assess the compliance with the
recommendations in this report and advise if further works are needed.
Inspections pertaining to footings, slab, retaining walls etc.. should be carried out
separately to the above inspections.
It should be noted, STA Consulting reserves the right to decline a request for a compliance inspection
and subsequent certification on the basis we have not undertaken staged site inspections as outlined
above.
9.0 CONCLUSION
In conclusion, it is our considered opinion, from a geotechnical viewpoint that the site is suitable for
the proposed residence that had been indicated by the client at the time of writing this report.
This recommendation is subject to the implementation of the measures specified within this report.
On site foundation inspections including footing, slab & retaining walls must be undertaken by a
suitably qualified and experienced Engineer.
Thank you for entrusting us with this work, if we can be of any further assistance in this matter,
please let us know.
For and on behalf of
STA Consulting Group Pty Ltd
Robin Cao BEng Justin J Williamson
MIEAust CPEng NPER RPEQ 12198 A.D. Civil Eng. Cert. Mining Eng
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - EXE22-0013Related documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.