ORDINARY MEETING MINUTES 15 JANUARY 2015
2864-OP4 A Stormwater Quality Maintenance, prepared by 15 October 2014
Construction Hydraulic
DD701 J Landscaping Plan, prepared by Cool 14 October 2014
Architecture
DD702 J Landscaping Notes & Schedules, prepared by 14 October 2014
Cool Architecture
Building Height
3. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
Performance Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to pre-start meeting. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this
permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Street Identification
5. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Building Appearance
6. All air conditioning units or other mechanical equipment must be fully enclosed
or screened such that they are not visible from the street frontages nor
adjoining properties.
Water & Sewer Connections
7. An underground connection to reticulated water and sewerage must be
provided to the development site in accordance with the standards and
requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
8. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to the development site.
Landscaping
9. The development site must be landscaped. The works must be undertaken in
accordance with The Noosa Plan, Planning Scheme Policy PSP03
Landscaping Plants and Guidelines and the approved plans.
10. Dense screening vegetation must be provided for the full length of the black
PVC chainlink fence and the bin enclosure along the Rene Street frontage.
11. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that
ensures healthy, sustained and vigorous plant growth. All plant material must
be allowed to grow to full form and be refurbished when its life expectancy is
reached.
12. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
Site Access and Driveways
Page 9 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.