13. A sealed access driveway must be provided from the common property road to
all parking and manoeuvring areas of the development. The works must include
in particular a driveway crossover in accordance with IPWEAQ standard
drawing SEQ R- 051 or R-052
Car Parking
14. A minimum of 17 car parking spaces must be provided and marked on the site.
The car parking must be made available and accessible at all times while the
use is open for business. The works must include in particular:
a. carspaces 1-5 and 12-15 must be allocated as staff parking spaces
b. 1 disabled parking space within the total
c. crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities
d. wheel stops for carspaces 7-12 to prevent vehicles entering the biobasin.
The wheel stops must be designed and installed in accordance with
AS/NZS2890.1:2004.
15. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all
times.
16. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Service Vehicles
17. Service vehicle parking, manoeuvring and standing spaces must be provided
on the site.
Stormwater Drainage & Quality
18. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge.
19. Any overflow from rainwater tanks installed on site must receive treatment
within the bioretention basin prior to release from the site.
Earthworks and Retaining Walls
20. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions
of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
21. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Page 10 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.