Original source · versioned page text
200917 La Mer Working Drawings - Rev #
Work in Progress
rev date issued details
client sign-off: date: Working Drawings
#-
WI 20.09.17 MS Working Drawings Rev#
P
existing rock wall and concrete
existing concrete steps steps to be demolished
and concrete block wall
to be demolished
existing concrete block wall to
be demolished
existing concrete block wall +
stairs to be demolished
demolish existing glass
existing spa balustrade
to be
demolished
existing pool
to be
demolished
builder to make allowance for
ventilation services as required existing DR-02
HR-02 HR-01
by proposed heat pumps
pool services store existing tiles to to be retained
1,097
store be demolished- and integrated
Pool services - refer to into new tiles
hydraulic engineer slab retained,
existing
bathroom
to be retained
1,377 190 5,538 4,023 90 1,121 90 7,131
1,377 190 2,506 300 6,755 90 6,275 2,068 FFL 3,530
1,377 190 15,925 2,068
existing tenant car parking
FHR to be relocated, to be
confirmed by others
a: shop 5, 212 david low way, peregian beach, qld 4573
p: (07) 5471 3033 Alterations and Additions Scale 1:100
sparks architects www.sparksarchitects.com
37 Hastings Street, Noosa Heads La Mer Body Corporate 141 MS Ground Floor Plan - Existing + Demolition WD 1.4 n
sparks architects pty. ltd. abn 89 124 611 721
qld architect's registration No. 3974 project client job no. drawn drawing dwg no.
GSPublisherVersion 166.6.74.18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.