Original source · versioned page text
200917 La Mer Working Drawings - Rev #
Work in Progress
rev date issued details
client sign-off: date: Working Drawings
#-
WI 20.09.17 MS Working Drawings Rev#
P
A B
23,820
G
2.5
W
2.3
F
3.6
C
3.3
N
2.1
1 E
2.4
E
2.2
D
3.4
3,570
A
B 3.1
2 3.2
D
3.4
A
B 3.1
3.2
builder to make allowance for
ventilation services as required existing DR-02
by proposed heat pumps HR-02 HR-01 up to be retained
800
entry
1,097
store FLF-02
and integrated
Pool services - refer to into new tiles
FFL3,490
hydraulic engineer pool services store 566 ducting
D
09
FHR
existing
H D D bathroom H
3.8 05 06 3.8
to be retained
1,377 190 5,538 4,023 90 1,121 90 7,131
1,377 190 2,506 300 6,755 90 6,275 2,068 FFL 3,530
1,377 190 15,925 2,068
ceiling ht 5.725
ceiling ht 5.94
existing tenant car parking
FHR to be relocated, to be
confirmed by others
a: shop 5, 212 david low way, peregian beach, qld 4573
p: (07) 5471 3033 Alterations and Additions Scale 1:100
sparks architects www.sparksarchitects.com
37 Hastings Street, Noosa Heads La Mer Body Corporate 141 MS Ground Floor Plan - Proposed WD 1.5 n
sparks architects pty. ltd. abn 89 124 611 721
qld architect's registration No. 3974 project client job no. drawn drawing dwg no.
GSPublisherVersion 166.6.74.18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.