Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Developed Case Peak Velocities (m/s)
Design Event
Comparison 8 17
Location
Point 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
9 18
upstream of
LEB1 us LEB Crossing 1.73 1.27 0.74 1.27 0.79 0.69 1.25 1.73 0.59 0.59 0.59 0.84 0.54 0.50 1.06 0.61
1 (Eenie Ck)
LEB Crossing
LEB1 1.04 0.92 0.11 0.00 0.00 0.00 0.00 1.08 0.00 0.00 0.00 0.00 0.00 0.00 2.12 1.40
1
EC1 Eenie Ck 0.21 0.19 0.17 0.16 0.45 0.20 0.24 0.21 0.13 0.12 0.14 0.09 0.09 0.22 0.50 0.24
EC2 Eenie Ck 1.24 1.20 1.15 1.08 1.05 0.86 0.69 1.24 0.80 0.83 0.83 0.79 0.73 0.63 1.48 0.97
EC3 Eenie Ck 1.30 1.26 1.23 1.15 1.07 0.84 0.62 1.30 0.83 0.86 0.88 0.85 0.79 0.64 1.58 1.02
EC4 Eenie Ck 0.18 0.17 0.16 0.16 0.15 0.13 0.11 0.18 0.13 0.13 0.12 0.12 0.12 0.10 0.45 0.19
EC5 Eenie Ck 1.35 1.27 1.20 1.11 1.05 0.90 0.70 1.35 0.48 0.55 0.61 0.62 0.59 0.48 1.06 0.60
Northbrook Corporation Pty Ltd 16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp H.Peak Velocities.docx Page 6
[OCR of page images]
Developed Case Peak Velocities (m/s)
Design Event
Comparison - 8 17
Point Location 1 2 3 4 5 6 7 | and] 10 | 14 | 12 | 13 | 14 | 15 | 16 | and
9 18
upstream of
LEB! us LEB Crossing | 1.73 | 1.27 | 0.74 | 1.27 | 0.79 | 0.69 | 1.25 | 1.73 | 0.59 | 0.59 | 0.59 | 0.84 | 0.54 | 0.50 | 1.06 | 0.61
1 (Eenie Ck)
LEB1 ce Crossing | 404 | 0.92 | 0.11 | 0.00 | 0.00 | 0.00 | 0.00 | 4.08 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2.12 | 1.40
EC1 Eenie Ck 0.21 | 0.19 | 0.17 | 016 | 0.45 | 0.20 | 0.24 | 0.21 | 0.13 | 0.12 | 0.14 | 0.09 | 0.09 | 0.22 | 0.50 | 0.24
EC2 Eenie Ck 1.24 | 1.20 | 1.15 | 1.08 | 1.05 | 0.86 | 0.69 | 1.24 | 0.80 | 0.83 | 0.83 | 079 | 0.73 | 0.63 | 1.48 | 0.97
EC3 Eenie Ck 1.30 | 1.26 | 1.23 | 1.15 | 1.07 | 0.84 | 0.62 | 1.30 | 0.83 | 0.86 | 0.88 | 0.85 | 0.79 | 0.64 | 1.58 | 1.02
EC4 Eenie Ck 0.18 | 0.17 | 0.16 | o16 | 0.15 | 0.13 | 0.11 | 0.18 | 0.13 | 0.13 | 0.12 | 0.12 | 012 | 0.10 | 0.45 | 0.19
EC5 Eenie Ck 1.35 | 1.27 | 1.20 | 1.11 | 1.05 | 0.90 | 0.70 | 1.35 | 0.48 | 0.55 | 0.61 | 062 | 0.59 | 0.48 | 1.06 | 0.60
Northbrook Corporation Pty Ltd
0:15101-19-03\wp\R1v1 Flood Study\App H - Peak Velocities.docx
16 October 2012
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.