Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Design Events
1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change
3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional
4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF
5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate
6. 2 Year ARI Local 12. 20 Year ARI Regional Change
Table H 3 Difference in Peak Velocities
Difference in Peak Velocities (Developed _
Existing) (m)
Design Event
Comparison 17
Location 8 and
Point 1 2 3 4 5 6 7 10 11 12 13 14 15 16 and
9
18
TidsRd Tidswell Road 0.63 0.49 0.39 -0.09 -0.67 -0.70 -0.68 0.66 -0.67 -0.69 -0.63 -0.65 -0.68 -0.70 0.16 0.60
downstream of
ds_TidsRd 0.29 -0.35 0.00 0.00 0.00 -0.20 0.18 0.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tidswell Road
HO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.02 0.00
H1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 -0.15 0.00
H2
upstream of 0.04 0.03 0.00 0.00 -0.02 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 -0.20 -0.07
Lot 11
H3 Lot 11 south -0.03 -0.03 0.06 -0.04 -0.19 -0.02 -0.02 -0.03 -0.01 -0.01 0.00 0.00 0.00 -0.01 -0.04 -0.01
H4 Lot 11 centre 0.47 0.24 0.38 0.25 0.21 0.40 0.33 0.47 -0.02 -0.03 -0.04 -0.03 -0.03 -0.02 -0.03 0.00
Southern
NBK01 road Keyser Ck -0.29 -0.28 -0.26 -0.25 -0.23 -0.20 -0.33 -0.29 -0.12 -0.16 -0.19 -0.29 -0.17 -0.15 0.08 -0.10
_
crossing
H5 Lot 11 north 0.10 0.20 0.15 0.08 0.12 0.09 0.12 0.10 0.09 0.08 0.06 0.05 0.04 0.02 0.21 0.14
Northern
NBK02_road Keyser Ck -0.56 -0.42 -0.59 -0.45 -0.56 -0.48 -0.48 -0.56 -0.13 -0.17 -0.20 -0.27 -0.42 -0.44 0.01 -0.12
crossing
H6 Keyser Ck 0.00 0.00 -0.08 -0.01 -0.03 0.06 -0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.02 0.00
H7 Keyser Ck -0.03 -0.03 -0.03 -0.03 -0.02 -0.01 -0.01 -0.03 0.00 0.00 0.00 0.00 0.00 0.00 -0.01 0.00
upstream of
H8 new road _
-0.08 -0.07 -0.06 -0.05 -0.04 -0.04 -0.02 -0.08 -0.05 -0.05 -0.03 -0.02 -0.02 -0.02 -0.25 -0.11
Nature Refuge
Northbrook Corporation Pty Ltd 16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp H.Peak Velocities.docx Page 7
[OCR of page images]
cJ> Cardno
Design Events
1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change
3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional
4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF
5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate
6. 2 Year ARI Local 12. 20 Year ARI Regional Change
Table H3 Difference in Peak Velocities
Difference in Peak Velocities (Developed — Existing) (m)
Design Event
Comparison | | ocati 8 and 17
Point ocation 1 2 3 4 5 6 7 3 10 14 12 13 14 15 16 and
18
TidsRd Tidswell Road 0.63 0.49 0.39 | -0.09 | -0.67 | -0.70 | -0.68 | 0.66 | -0.67 | -0.69 | -0.63 | -0.65 | -0.68 | -0.70 | 0.16 0.60
5 downstream of
ds_TidsRd Tidswell Road 0.29 | -0.35 | 0.00 0.00 0.00 | -0.20 | 0.18 0.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
HO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 | -0.02 | 0.00
H1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 | -0.15 | 0.00
H2 em of 0.04 | 0.03 | 0.00 | 0.00 | -0.02 | 0.00 | 0.00 | 0.03 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | -0.20 | -0.07
H3 Lot 11 south -0.03 | -0.03 | 0.06 | -0.04 | -0.19 | -0.02 | -0.02 | -0.03 | -0.01 | -0.01 0.00 0.00 0.00 | -0.01 | -0.04 | -0.01
H4 Lot 11 centre 0.47 0.24 0.38 0.25 0.21 0.40 0.33 0.47 | -0.02 | -0.03 | -0.04 | -0.03 | -0.03 | -0.02 | -0.03 | 0.00
Southern
NBKO1_road | Keyser Ck -0.29 | -0.28 | -0.26 | -0.25 | -0.23 | -0.20 | -0.33 | -0.29 | -0.12 | -0.16 | -0.19 | -0.29 | -0.17 | -0.15 | 0.08 | -0.10
crossing
H5 Lot 11 north 0.10 0.20 0.15 0.08 0.12 0.09 0.12 0.10 0.09 0.08 0.06 0.05 0.04 0.02 0.21 0.14
Northern
NBKO2_road | Keyser Ck -0.56 | -0.42 | -0.59 | -0.45 | -0.56 | -0.48 | -0.48 | -0.56 | -0.13 | -0.17 | -0.20 | -0.27 | -0.42 | -0.44 | 0.01 -0.12
crossing
H6 Keyser Ck 0.00 0.00 | -0.08 | -0.01 | -0.03 | 0.06 | -0.05 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00 | -0.02 | 0.00
H7 Keyser Ck -0.03 | -0.03 | -0.03 | -0.03 | -0.02 | -0.01 | -0.01 | -0.03 | 0.00 0.00 0.00 0.00 0.00 0.00 | -0.01 0.00
upstream of
H8 new road — -0.08 | -0.07 | -0.06 | -0.05 | -0.04 | -0.04 | -0.02 | -0.08 | -0.05 | -0.05 | -0.03 | -0.02 | -0.02 | -0.02 | -0.25 | -0.11
Nature Refuge
Northbrook Corporation Pty Ltd
0:15101-19-03\wp\R1v1 Flood Study\App H - Peak Velocities.docx
16 October 2012
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.