Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
Flood Study
~,.,CardnO.
Table 3-1 TUFlOW Model Runs
1~1il!m
IDm’iflnl? I lh11lom OOWtItml(Wrt41 ~!~I
Local Events -
MHWS
1 100 year ARI MHWS 100
2 50 year ARI MHWS 50
3 20 year ARI MHWS 20
4 10 year ARI MHWS 10
5 5 year ARI MHWS 5
6 2 year ARI MHWS 2
7 1 year ARI MHWS 1
100 Year ARI Local Event -
Storm Surge
1.8 mAHD -
100 year
8 20 year ARI 100
storm surge
1.5 mAHD 20 year
-
9 100 year ARI 100
storm surge
Regional Events
Regional 100 year,
10 100 year, 30 hour 30 hour 100
(peak of 2.04 mAHD)
Regional 50 year,
11 50 year, 30 hour 30 hour 50
(peak of 1.76 mAHD)
Regional 20 year,
12 20 year, 30 hour 30 hour 20
(peak of 1.52 mAHD)
Regional 10 year,
13 10 year, 30 hour 30 hour 10
(peak of 1.39 mAHD)
Regional 5 year,
14 5 year, 30 hour 30 hour 5
(peak of 1.33 mAHD)
Regional 2 year,
15 2 year, 30 hour 30 hour 2
(peak of 1.26 mAHD)
Probable Maximum Flood
2.68 mAHD 1000 year
16 PMF
I .
Storm Surge
-
PMF
Climate Change
20 year ARI- 2.6 mAHD 100 year
-
17 100 (CC)
increased by 20% storm surge + 0.8m
100 year ARI -
2.3 mAHD -
20 year
18 100 (CC)
increased by 20% storm surge + 0.8m
The initial water levels in TUFlOW were set to equal the downstream tailwater condition. The existing dam
located within the Hofmann site was assumed to be full prior to the start of the storm events.
The modelled PMF event addresses local flooding only. The regional Noosa River PMF event will result in
the peak water levels for lake Weyba and the downstream section of the site. Council has advised that the
latest PMF level for Lake Weyba is 4.23 mAHD (per comm. Geoffrey Newell). This flood level will therefore
also need to be referenced when defining road levels that will be used as emergency evacuation routes.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.