Noosa on Weyba
Flood Study
~,.,CardnO.
3.2.7 Time Step
The time step adopted in the modelling was 3 seconds for the 2D area and 1 second for the 1 D area. For
TUFLOW modelling it is recommended that the 2D time step not be less than a quarter of the grid size,
which would be 1.25 seconds in this instance. A model requiring a smaller time step can indicate
instabilities.
The resultant continuity error in the TUFLOW modelling was around 0.15 percent, which indicates that the
model was very stable.
3.2.8 Existing Structures
The existing culvert crossings of Lake Entrance Boulevard and Aspera Place were entered into the model as
1 D structures. The details of the culvert crossings were taken from SCRC online mapping. Where no
information was available for the invert levels or sizes, the details were taken from site inspection. The
photographs below show the culvert crossings in this area.
Photo 1 lake Entrance Boulevard -
Crossing 1
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.