Noosa on Weyba
Flood Study
                                                                                                 ~,.,CardnO.

      .     Lake Entrance Boulevard Crossing 2            -
                                                              4/2700 by 900mm RCBC (upstream IL = 1.19 mAHD,
            downstream IL         =   1.18 mAHD, length   =
                                                              22.3m);
      .     Lake Entrance Boulevard Crossing 3            -
                                                              2/750mm RCPs (upstream IL = 1.038 mAHD, downstream IL
            =   0.816 mAHD, length = 37.1 m); and

      .     Aspera Place Crossing          -
                                               1 0/1800mm RCPs (upstream IL       =   2.40 mAHD, downstream IL   =   2.30

            mAHD, length      =
                                  20m).
The road height levels were taken from the DTM.

The third crossing of Lake Entrance Boulevard appears to be deliberately undersized so as to divert flows

through the waterway crossing of Aspera Place, and reduce flooding of downstream areas along Lake
Entrance Boulevard.

A 450mm low flow pipe was included underneath Hollett Road. The surveyed invert level of this culvert was
6.53 mAHD.

Typical entry and exit losses of 0.5 and 1.0 respectively were assumed for the culverts, unless specified
otherwise.

No blockage of the existing culverts was assumed.

The Walter Hay Drive bridge was modelled as a 2D structure based on plans obtained from the Department
of Main Roads.

No structures were included in the 1 D section of the model as the model ended upstream of Weyba Road.
The recent bridge crossing of Weyba Creek at Eenie Creek Road was not included as it was not in the Mike
11 model.            The bridge   crossing is not expected to have a significant impact on peak flood levels as the
bridge deck is well above peak flood levels, there is a large spacing between piers, and there are low flow
velocities in this area.


3.3       Model Calibration

The results of the TUFLOW model were compared to the flood event of the 24th of February 2012. SCRC
had debris levels surveyed around Lake Entrance Boulevard following this event. The rainfall was quite

spatially varied. The closest gauges at Tewantin and Upper Doonan recorded 196mm and 109mm
respectively over a 210 minute period. The rainfall applied to the WBNM sub-catchments were weighted
based on their location relative to the gauges.

The intensity frequency duration (IFD) analysis of this rainfall event at the two gauges is shown below in

Image 1.




Northbrook Corporation Pty Ltd                                   Version 1                                   23 October 2012
Flood Study v1.doc                                     Commercial in Confidence                                             Page 9

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.