Skip to the record
The gold standard in government transparency.

Council archive · source document

Part 8 of 37 Appendix 6 - Flood Study MCU12/0208

of 115

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Noosa on Weyba
Flood Study
                                                                                                                          ~,.,CardnO.




         100




   ~
  ..c:

  E

  i!’
  .;;;
   c:
   Qj

  ~

  ~
   ;
  0::




         10

           0.125                   0.25                       0.5


                                                                                  Hours


               -1Year ARI   -2YearARI     -SYearARI   -10Year ARI    -2QYearARI   -50Year ARI   -lOOYearARI   ......
                                                                                                                       TewantinGauge   ---
                                                                                                                                             Upper Doonan Gauge




Image 1                     IFD Analysis of February 2012 Event


The above image shows that the rainfall recorded at the Tewantin gauge had an ARI of more than 100 years
for storm durations between 1 and 3 hours, which is similar to the times of concentration of the sub-
catchments. The rainfall recorded at the Upper Doonan gauge had an ARI of approximately 5 years. This
highlights the spatial variability of rainfall intensity during this event.                                   As the site and its                     contributing
catchments are located between these two gauges it is likely that the resultant ARI would be less than 100
years.




Northbrook Corporation Pty Ltd                                             Version 1                                                               23 October 2012
Flood Study v1.doc                                                  Commercial in Confidence                                                                      Page 10

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.