4 Hydrologic Model
4.1 Rational Method
4.1.1 Sub-catchments
The catchment areas were delineated using a combination of LiDAR data from DEHP, the digital 25 metre
grid DTM of South-East Queensland provided by DEHP and the catchment boundaries used in the Noosa
River Flood Study. The resultant sub-catchments are shown in Figure 1. The delineation of the Eenie
Creek and Keyser Creek tributaries of Lake Weyba was much more detailed than that conducted for the
regional flood study, and so comparison of the resultant peak flows from these catchments is not
appropriate.
4.1.2 Times of Concentration
The times of concentration were points for different tributaries using the Bransby
calculated at several
William’s Equation, which is the preferred method of QUDM (2007) for rural catchments less than 500
hectares. A summary of the calculations is shown below in Table 4-1. The total time of concentration for the
two creeks draining towards Lake Weyba was around 3 hours.
.
Ta ble 41 - B ransb)y Wll"
I lams rImeofConcentratlon Ca I cu I atlons
~ mmmrn
~
~
t.::mm
~
V
. ,
,
.
’ii3
~
EC A2 230.29 2.53 1.54 78.1
EC B2 349.48 4.44 3.62 110.8
EC C1 72.48 2.08 1.89 69.0
EC E4 285.22 2.50 1.34 77.6
EC F6 76.58 1.41 1.53 48.8
KC 12 139.68 1.75 1.65 56.1
KC H2 246.54 2.49 1.31 79.0
All
catchments
draining to 1643.33 7.58 2.64 172.7
Eenie Creek
and Keyser
Creek
4.1.3 Rainfall Intensity
The rainfall intensities were taken from Noosa using AUSIFD. The resultant rainfall intensities are shown in
Appendix C.
4.1.4 Fraction Impervious
The fraction impervious values for the sub-catchments were taken from the values used for the Noosa River
Flood Study. The lake was assumed to be fully impervious.
4.1.5 Runoff Coefficient
The runoff coefficient for each sub-catchment was calculated from QUDM. Based on the rainfall intensity a
10 year runoff co-efficient for fully pervious areas of 0.70 was adopted.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.