Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
Flood Study
~,.,CardnO.
whether there are any negative impacts in relation to local and regional flooding as a result of this
development.
8.5 Sensitivity Analysis
8.5.1 Waterway Corridor Revegetation
A scenario was run proposed waterway corridor was densely revegetated, with a typical
where the
Manning’s n roughness of 0.15, to determine the potential impact on the 100 year ARI peak water levels.
This will determine whether revegetation would be feasible in this area.
Figure 36 shows the impact of revegetating the western drainage channel. The results are shown for the
100 year ARI events (local and regional) compared to the developed case without revegetation. The results
show an increase in water level of up to 100mm at the southern boundary of the site. The lot levels have
been set 500mm above the 100 year ARI peak flood level with climate change. Therefore there is
considered to be more than sufficient freeboard to account for this impact of revegetation.
Upstream of the Lot 11, there is a small area of increase in peak water level extending for a distance of
approximately 20 metres further upstream. The increase is approximately 10mm. However as this area is a
densely vegetated drainage channel, and no existing properties are impacted, this localised increase is
considered to be acceptable. Dense revegetation of the western drainage channel is therefore considered to
be achievable with acceptable flood impacts for the site and surrounding properties.
8.5.2 Culvert Blockage
A scenario was also run with 20 percent blockage of the proposed culverts. This will determine whether
additional freeboard would be required.
The results are shown for the 100 year ARI events (local and regional) compared to the developed case
without blockage. The base case assumed no blockage as the culvert crossings are also being utilised for
attenuation of peak flows, and reducing the flow capacity would have reduced peak flows downstream.
The average impact of 20 percent culvert blockage was:
. Hollett Road West: 25mm increase in upstream peak water level;
. Easement crossing: 30mm increase in upstream peak water level;
. Hollett Road East tributary crossing: 60mm increase in upstream peak water level;
. Hollett Road East: 20mm increase in upstream peak water level;
. Southern Keyser Creek crossing: 30mm increase in upstream peak water level; and
. Tidswell Road: 20mm increase in upstream peak water level.
The freeboard provided is considered to be sufficient to account for these increases. The peak depths over
the road will be slightly increased, however it is considered that this will not impact on the level of trafficability
as current peak depths in the PMF and 100 year ARI events are less than the limiting values.
8.6 Proposed Emergency Evacuation Routes
Figures 38 and 39 show the PMF peak flood levels and depths. There are high points within each section of
the development where people could safely congregate in a PMF event. In particular Precincts E and L,
which are proposed retirement villages and aged care facilities are well above the PMF flood level.
Access for emergency vehicles may be required in a PMF event. The emergency evacuation routes are
shown in Figure 14. All areas of the site can be accessed during a PMF event. For Precinct F, they would
need to utilise the formalised fire track along the southern boundary of the site and then exit the site via the
Hollett Road East crossing of Keyser Creek.
Flood access for neighbouring areas will also be improved, as described below.
. The existing property to the south of Lot 11 is inaccessible during a 5 year ARI event. This lot would
have access during a PMF event.
. The existing properties located around Precinct L would also have access along Hollett Road West
improved from 10 year ARI trafficability to PMF trafficability.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.