Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Part 8 of 37 Appendix 6 - Flood Study MCU12/0208

of 115

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                                                           <..f)Cardno
Design Events
      1.    100 Year ARI Local                                     6.   2 Year ARI Local                        11. 50 Year ARI Regional                       16. PMF
      2.    50 Year ARI Local                                      7.   1 Year ARI Local                        12. 20 Year ARI Regional                       17. 100 Year ARI Climate
      3.    20 Year ARI Local                                      8.   100 Year ARI Storm Surge                13. 10 Year ARI Regional                          Change
      4.    10 Year ARI Local                                      9.   100 Year ARI Storm Surge                14. 5 Year ARI Regional                        18. 100 Year ARI Climate
      5.    5 Year ARI Local                                       10. 100 Year ARI Regional                    15. 2 Year ARI Regional                           Change


                Table F 1           Existing Case Peak Water Levels

                                                                                                         Existing Case Peak Water Levels (mAHD)
                                                                                                                       Design Event
 Comparison                                         Surface                                                              8                                                                    17
                         Location
 Point                                                Level       1        2      3         4      5      6       7     and     10        11     12      13        14      15       16       and
                                                                                                                         9                                                                    18

 TidsRd                  Tidswell Road                 3.40      4.10    4.02    3.97      3.88   3.81   3.70   3.63   4.10    3.85   3.80       3.75   3.69      3.65   3.59      4.93      4.19

                         downstream of
 ds_TidsRd                                                       4.02    3.94    3.88      3.77   3.68   3.51   3.39   4.02    3.76   3.70       3.64   3.57      3.51   3.39      4.87      4.12
                         Tidswell Road
 HO                                                              3.72    3.66    3.61      3.52   3.45   3.32   3.21    3.72   3.53   3.48       3.43   3.38      3.32   3.22      4.44      3.80

 H1                                                              3.07    3.04    3.01      2.96   2.93   2.90   2.86    3.07   2.96   2.95       2.93   2.91      2.90   2.86      3.75      3.12

 H2
                         upstream of                             2.61    2.57   2.54       2.48   2.43   2.34   2.26   2.62    2.50   2.47       2.43   2.39      2.36   2.29      3.67      2.81
                         Lot 11

 H3                      Lot 11 south                            2.17    2.10   2.04       1.95   1.88   1.74   1.63   2.23    2.18   2.02       1.91   1.84      1.78   1.67      3.66      2.79

 H4                      Lot 11 centre                           2.11    2.04    1.98      1.90   1.83   1.70   1.59   2.19    2.17       1.99   1.87   1.80      1.74   1.64      3.65      2.78

                         Southern
 NBK01      _
                road     Keyser Ck                               2.11    2.03    1.97      1.89   1.82   1.70   1.59   2.19    2.16       1.99   1.87   1.79      1.74   1.63      3.65      2.78
                         crossing
 H5                      Lot 11 north                            2.09    2.00    1.94      1.86   1.79   1.66   1.56   2.17    2.16       1.97   1.85   1.77      1.71   1.60      3.65      2.78

                         Northern
 NBK02_road              Keyser Ck                               2.08    1.99    1.93      1.85   1.78   1.65   1.55   2.17    2.16       1.97   1.84   1.76      1.70   1.59      3.65      2.78
                         crossing
 H6                      Keyser Ck                               2.01    1.91    1.82      1.70   1.60   1.45   1.36   2.12    2.13       1.92   1.76   1.64      1.55   1.42      3.63      2.77

 H7                      Keyser Ck                               1.93    1.82    1.73      1.60   1.47   1.24   1.09   2.07    2.11       1.88   1.69   1.56      1.46   1.31      3.59      2.76

                         upstream of
 H8                      new road      _
                                                                 4.85    4.82   4.79       4.74   4.70   4.63   4.57   4.85    4.65   4.62       4.60   4.57      4.54   4.50      5.29      4.86
                         Nature Refuge

                         tributary                               4.23    4.19   4.15       4.09   4.04   3.96   3.88   4.23    3.98   3.95       3.92   3.88      3.85   3.80      4.77      4.25
 NBK03_road
                         crossing



Northbrook Corporation Pty Ltd                                                                                                                                                  16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp F.Peak Flood Levels.docx                                                                                                                            Page 1


[OCR of page images]
cJ> Cardno

 

Design Events

1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF

2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change

4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table F1 Existing Case Peak Water Levels
Existing Case Peak Water Levels (mAHD)
Design Event
Comparison | Surface 8 17
Point Location Level 1 2 3 4 5 6 7 | and | 10 1 12 13 14 15 16 | and
9 18
TidsRd Tidswell Road 3.40 | 4.10 | 4.02 | 3.97 | 3.88 | 3.81 | 3.70 | 3.63 | 4.10 | 3.85 | 3.80 | 3.75 | 3.69 | 3.65 | 3.59 | 4.93 | 4.19
ds _TidsRad | COwnstream of 4.02 | 3.94 | 3.88 | 3.77 | 3.68 | 3.51 | 3.39 | 4.02 | 3.76 | 3.70 | 3.64 | 3.57 | 3.51 | 3.39 | 4.87 | 4.12
Tidswell Road
HO 3.72 | 3.66 | 3.61 | 3.52 | 3.45 | 3.32 | 3.21 | 3.72 | 3.53 | 3.48 | 3.43 | 3.38 | 3.32 | 3.22 | 4.44 | 3.80
H1 3.07 | 3.04 | 3.01 | 2.96 | 2.93 | 2.90 | 2.86 | 3.07 | 2.96 | 2.95 | 293 | 2.91 | 2.90 | 286 | 3.75 | 3.12
H2 eae or 2.61 | 2.57 | 2.54 | 2.48 | 2.43 | 2.34 | 2.26 | 2.62 | 2.50 | 2.47 | 2.43 | 2.30 | 236 | 2.29 | 3.67 | 2.81
H3 Lot 11 south 2.17 | 2.10 | 2.04 | 1.95 | 1.88 | 1.74 | 1.63 | 2.23 | 2.18 | 2.02 | 1.91 | 1.84 | 1.78 | 1.67 | 3.66 | 2.79
H4 Lot 11 centre 2.11 | 2.04 | 1.98 | 1.90 | 1.83 | 1.70 | 1.59 | 2.19 | 2.17 | 1.99 | 1.87 | 1.80 | 1.74 | 1.64 | 3.65 | 2.78
Southern
NBKO1_road | Keyser Ck 2.11 | 2.03 | 1.97 | 1.89 | 1.82 | 1.70 | 1.59 | 2.19 | 2.16 | 1.99 | 1.87 | 1.79 | 1.74 | 1.63 | 3.65 | 2.78
crossing
H5 Lot 11 north 2.09 | 2.00 | 1.94 | 1.86 | 1.79 | 1.66 | 1.56 | 2.17 | 2.16 | 1.97 | 1.85 | 1.77 | 1.71 | 1.60 | 3.65 | 2.78
Northern
NBKO2_road | Keyser Ck 2.08 | 1.99 | 1.93 | 1.85 | 1.78 | 1.65 | 1.55 | 2.17 | 2.16 | 1.97 | 1.84 | 1.76 | 1.70 | 1.59 | 3.65 | 2.78
crossing
H6 Keyser Ck 2.01 | 1.91 | 1.82 | 1.70 | 1.60 | 1.45 | 1.36 | 2.12 | 2.13 | 1.92 | 1.76 | 1.64 | 1.55 | 1.42 | 3.63 | 2.77
H7 Keyser Ck 1.93 | 1.82 | 1.73 | 1.60 | 1.47 | 1.24 | 1.09 | 2.07 | 2.11 | 1.88 | 1.69 | 1.56 | 1.46 | 1.31 | 3.59 | 2.76
upstream of
H8 new road — 4.85 | 4.82 | 4.79 | 4.74 | 4.70 | 4.63 | 4.57 | 4.85 | 4.65 | 4.62 | 4.60 | 4.57 | 4.54 | 4.50 | 5.29 | 4.86
Nature Refuge
NBKO3_road amnesia 4.23 | 4.19 | 4.15 | 4.09 | 4.04 | 3.96 | 3.88 | 4.23 | 3.98 | 3.95 | 3.92 | 3.88 | 3.85 | 3.80 | 4.77 | 4.25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Northbrook Corporation Pty Ltd
0:15101-19-O03\wp\R1v1 Flood Study\App F - Peak Flood Levels.docx

16 October 2012
Page 1

 

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.