Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Existing Case Peak Water Levels (mAHD)
Design Event
Comparison Surface 8 17
Location
Point Level 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
9 18
upstream
H9 7.92 7.90 7.88 7.85 7.83 7.80 7.77 7.92 7.81 7.80 7.78 7.77 7.75 7.73 8.19 7.93
Hollett Road
HolIRd Hollett Rd 7.08 7.41 7.39 7.38 7.35 7.33 7.30 7.27 7.41 7.31 7.30 7.29 7.28 7.25 7.23 7.62 7.42
H10 Lot 53 4.17 4.08 4.02 3.90 3.80 3.61 3.46 4.17 3.78 3.71 3.65 3.57 3.51 3.39 5.28 4.29
H11
upstream of 3.51 3.42 3.37 3.28 3.19 3.04 2.94 3.52 3.20 3.14 3.09 3.03 2.99 2.91 5.12 3.70
easement
ease_road easement 3.37 3.27 3.20 3.10 3.00 2.80 2.61 3.38 3.04 2.95 2.88 2.80 2.72 2.54 5.11 3.62
downstream of
H12 3.20 3.03 2.90 2.73 2.64 2.42 2.24 3.23 2.86 2.73 2.60 2.47 2.36 2.20 5.08 3.52
easement
confluence
H13 3.15 2.96 2.82 2.62 2.43 2.08 1.78 3.17 2.78 2.64 2.48 2.32 2.19 1.93 5.05 3.48
Eenie Ck
upstream
H14 5.16 4.95 4.80 4.53 4.30 3.89 3.59 5.16 4.54 4.39 4.23 4.04 3.88 3.58 7.18 5.40
Precinct L
H15 Precinct L 4.90 4.70 4.55 4.30 4.07 3.66 3.36 4.91 4.33 4.18 4.02 3.84 3.69 3.41 6.84 5.15
upstream of
LEB3 us LEB Crossing 4.56 4.38 4.24 4.02 3.82 3.46 3.21 4.57 4.06 3.92 3.78 3.63 3.49 3.26 6.17 4.77
3
LEB Crossing
LEB3 3.97 4.24 4.15 4.08 n/a n/a n/a n/a 4.24 n/a n/a n/a n/a n/a n/a 6.09 4.35
3
upstream of
AspPI us 4.45 4.27 4.14 3.94 3.75 3.41 3.17 4.46 3.97 3.85 3.72 3.57 3.44 3.22 5.94 4.67
Aspera PI
AspPI Aspera PI 4.51 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 5.56 4.66
downstream of
AspPI ds 4.15 4.04 3.95 3.81 3.65 3.36 3.14 4.15 3.82 3.74 3.63 3.50 3.39 3.19 5.68 4.29
Aspera PI
upstream of
LEB2 us LEB Crossing 4.31 4.18 4.11 3.99 3.86 3.61 3.27 4.31 3.94 3.86 3.78 3.67 3.53 3.17 6.13 4.49
2
LEB Crossing
LEB2 3.20 4.18 4.06 3.99 3.89 3.79 3.59 3.43 4.18 3.85 3.79 3.73 3.64 3.51 3.43 6.07 4.38
2
LEB -
adjacent
LEB2 ds 3.70 3.49 3.36 3.16 3.00 2.76 2.57 3.72 3.23 3.10 2.97 2.84 2.74 2.56 5.90 4.03
to flooded lots
upstream of
LEB1 us 4.02 3.84 3.67 3.30 3.00 2.54 2.25 4.03 3.41 3.18 2.95 2.74 2.57 2.26 5.95 4.24
LEB Crossing
Northbrook Corporation Pty Ltd 16 October 2012
O:15101-19-03IwpIR1v1 Flood StudylApp F -
Peak Flood Levels.docx Page 2
[OCR of page images]
Existing Case Peak Water Levels (mAHD)
Design Event
Comparison - Surface 8 17
Point Location Level 1 2 3 4 5 6 7 | and | 10 11 12 13 14 15 16 | and
9 18
H9 upstream 7.92 | 7.90 | 7.88 | 7.85 | 7.83 | 7.80 | 7.77 | 7.92 | 7.81 | 7.80 | 7.78 | 7.77 | 7.75 | 7.73 | 8.19 | 7.93
Hollett Road
HollRd Hollett Rd 7.038 | 7.41 | 7.39 | 7.38 | 7.35 | 7.33 | 7.30 | 7.27 | 7.41 | 7.31 | 7.30 | 7.29 | 7.28 | 7.25 | 7.23 | 7.62 | 7.42
H10 Lot 53 4.17 | 4.08 | 4.02 | 3.90 | 3.80 | 3.61 | 3.46 | 4.17 | 3.78 | 3.71 | 3.65 | 3.57 | 3.51 | 3.39 | 5.28 | 4.29
H11 Cesta) Bt 3.51 | 3.42 | 3.37 | 3.28 | 3.19 | 3.04 | 2.94 | 3.52 | 3.20 | 3.14 | 3.09 | 3.03 | 2.99 | 2.91 | 5.12 | 3.70
ease_road | easement 3.37 | 3.27 | 3.20 | 3.10 | 3.00 | 2.80 | 261 | 3.38 | 3.04 | 2.95 | 288 | 280 | 2.72 | 2.54 | 5.11 | 3.62
H12 downstreant-ot 3.20 | 3.03 | 2.90 | 2.73 | 2.64 | 2.42 | 2.24 | 3.23 | 2.86 | 2.73 | 260 | 2.47 | 2.36 | 2.20 | 5.08 | 3.52
easement
H13 ponfuence 3.15 | 2.96 | 2.82 | 2.62 | 2.43 | 2.08 | 1.78 | 3.17 | 2.78 | 2.64 | 2.48 | 2.32 | 2.19 | 1.93 | 5.05 | 3.48
H14 apsiean 5.16 | 4.95 | 4.80 | 4.53 | 4.30 | 3.89 | 3.59 | 5.16 | 4.54 | 4.39 | 4.23 | 4.04 | 3.88 | 3.58 | 7.18 | 5.40
H15 Precinct L 4.90 | 4.70 | 4.55 | 4.30 | 4.07 | 3.66 | 3.36 | 4.91 | 4.33 | 4.18 | 4.02 | 3.84 | 3.69 | 3.41 | 6.84 | 5.15
upstream of
LEB3 us LEB Crossing 4.56 | 4.38 | 4.24 | 4.02 | 3.82 | 3.46 | 3.21 | 4.57 | 4.06 | 3.92 | 3.78 | 3.63 | 3.49 | 3.26 | 6.17 | 4.77
3
LEB3 se rossina | 3.907 | 4.24] 4.15 | 4.08 | ova | ma | wa | na | 4.24] ma | na | wa | wa | ma | ma | 609 | 4.35
AspPI us aepera PI 4.45 | 4.27 | 4.14 | 3.94 | 3.75 | 3.41 | 3.17 | 4.46 | 3.97 | 3.85 | 3.72 | 3.57 | 3.44 | 3.22 | 5.94 | 4.67
AspPI Aspera Pl 4.51 n/a n/a n/a n/a n/a na n/a n/a nia nia n/a n/a n/a n/a | 5.56 | 4.66
AspPI ds ee of 4.15 | 4.04 | 3.95 | 3.81 | 3.65 | 3.36 | 3.14 | 4.15 | 3.82 | 3.74 | 3.63 | 3.50 | 3.39 | 3.19 | 5.68 | 4.29
upstream of
LEB2 us LEB Crossing 4.31 | 4.18 | 4.11 | 3.99 | 3.86 | 3.61 | 3.27 | 4.31 | 3.94 | 3.86 | 3.78 | 3.67 | 3.53 | 3.17 | 6.13 | 4.49
2
LEB2 . Crossing 3.20 | 4.18 | 4.06 | 3.99 | 3.89 | 3.79 | 3.59 | 3.43 | 4.18 | 3.85 | 3.79 | 3.73 | 3.64 | 3.51 | 3.43 | 6.07 | 4.38
LEB - adjacent
LEB2 ds to hooded lots 3.70 | 3.49 | 3.36 | 3.16 | 3.00 | 2.76 | 2.57 | 3.72 | 3.23 | 3.10 | 297 | 2.84 | 2.74 | 2.56 | 5.90 | 4.03
LEB1 us upstream of 4.02 | 3.84 | 3.67 | 3.30 | 3.00 | 2.54 | 2.25 | 4.03 | 3.41 | 3.18 | 2.95 | 2.74 | 257 | 2.26 | 5.95 | 4.24
LEB Crossing
Northbrook Corporation Pty Ltd
0:15101-19-O03\wp\R1v1 Flood Study\App F - Peak Flood Levels.docx
16 October 2012
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.