Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Part 8 of 37 Appendix 6 - Flood Study MCU12/0208

of 115

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                                                       <..f)Cardno
                                                                                                          Existing Case Peak Water Levels (mAHD)
                                                                                                                        Design Event
 Comparison                                              Surface                                                          8                                                             17
                         Location
 Point                                                      Level       1      2      3      4      5      6      7     and     10     11     12     13     14      15        16       and
                                                                                                                          9                                                             18
                         upstream
 H9                                                                    7.92   7.90   7.88   7.85   7.83   7.80   7.77   7.92   7.81    7.80   7.78   7.77   7.75   7.73      8.19      7.93
                         Hollett Road

 HolIRd                  Hollett Rd                          7.08      7.41   7.39   7.38   7.35   7.33   7.30   7.27   7.41   7.31    7.30   7.29   7.28   7.25   7.23      7.62      7.42

 H10                     Lot 53                                        4.17   4.08   4.02   3.90   3.80   3.61   3.46   4.17   3.78    3.71   3.65   3.57   3.51   3.39      5.28      4.29

 H11
                         upstream of                                   3.51   3.42   3.37   3.28   3.19   3.04   2.94   3.52   3.20    3.14   3.09   3.03   2.99   2.91      5.12      3.70
                         easement

 ease_road               easement                                      3.37   3.27   3.20   3.10   3.00   2.80   2.61   3.38   3.04    2.95   2.88   2.80   2.72   2.54      5.11      3.62

                         downstream of
 H12                                                                   3.20   3.03   2.90   2.73   2.64   2.42   2.24   3.23   2.86    2.73   2.60   2.47   2.36   2.20      5.08      3.52
                         easement
                         confluence
 H13                                                                   3.15   2.96   2.82   2.62   2.43   2.08   1.78   3.17   2.78    2.64   2.48   2.32   2.19   1.93      5.05      3.48
                         Eenie Ck
                         upstream
 H14                                                                   5.16   4.95   4.80   4.53   4.30   3.89   3.59   5.16   4.54    4.39   4.23   4.04   3.88   3.58      7.18      5.40
                         Precinct L

 H15                     Precinct L                                    4.90   4.70   4.55   4.30   4.07   3.66   3.36   4.91   4.33    4.18   4.02   3.84   3.69   3.41      6.84      5.15

                         upstream of
 LEB3 us                 LEB Crossing                                  4.56   4.38   4.24   4.02   3.82   3.46   3.21   4.57   4.06    3.92   3.78   3.63   3.49   3.26      6.17      4.77
                         3
                         LEB Crossing
 LEB3                                                        3.97      4.24   4.15   4.08   n/a    n/a    n/a    n/a    4.24    n/a    n/a    n/a    n/a    n/a    n/a       6.09      4.35
                         3
                         upstream of
 AspPI us                                                              4.45   4.27   4.14   3.94   3.75   3.41   3.17   4.46   3.97    3.85   3.72   3.57   3.44   3.22      5.94      4.67
                         Aspera PI
 AspPI                   Aspera PI                          4.51       n/a    n/a    n/a    n/a    n/a    n/a    n/a     n/a    n/a    n/a    n/a    n/a    n/a    n/a       5.56      4.66

                         downstream of
 AspPI ds                                                              4.15   4.04   3.95   3.81   3.65   3.36   3.14   4.15   3.82    3.74   3.63   3.50   3.39   3.19      5.68      4.29
                         Aspera PI
                         upstream of
 LEB2 us                 LEB Crossing                                  4.31   4.18   4.11   3.99   3.86   3.61   3.27   4.31   3.94    3.86   3.78   3.67   3.53   3.17      6.13      4.49
                         2
                         LEB Crossing
 LEB2                                                        3.20      4.18   4.06   3.99   3.89   3.79   3.59   3.43   4.18   3.85    3.79   3.73   3.64   3.51   3.43      6.07      4.38
                         2
                         LEB    -
                                    adjacent
 LEB2 ds                                                               3.70   3.49   3.36   3.16   3.00   2.76   2.57   3.72   3.23    3.10   2.97   2.84   2.74   2.56      5.90      4.03
                         to flooded lots

                         upstream of
 LEB1 us                                                               4.02   3.84   3.67   3.30   3.00   2.54   2.25   4.03   3.41    3.18   2.95   2.74   2.57   2.26      5.95      4.24
                         LEB Crossing




Northbrook Corporation Pty Ltd                                                                                                                                            16 October 2012
O:15101-19-03IwpIR1v1 Flood StudylApp F   -
                                              Peak Flood Levels.docx                                                                                                                Page 2


[OCR of page images]
 

 

Existing Case Peak Water Levels (mAHD)

 

Design Event

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Comparison - Surface 8 17
Point Location Level 1 2 3 4 5 6 7 | and | 10 11 12 13 14 15 16 | and
9 18

H9 upstream 7.92 | 7.90 | 7.88 | 7.85 | 7.83 | 7.80 | 7.77 | 7.92 | 7.81 | 7.80 | 7.78 | 7.77 | 7.75 | 7.73 | 8.19 | 7.93
Hollett Road

HollRd Hollett Rd 7.038 | 7.41 | 7.39 | 7.38 | 7.35 | 7.33 | 7.30 | 7.27 | 7.41 | 7.31 | 7.30 | 7.29 | 7.28 | 7.25 | 7.23 | 7.62 | 7.42

H10 Lot 53 4.17 | 4.08 | 4.02 | 3.90 | 3.80 | 3.61 | 3.46 | 4.17 | 3.78 | 3.71 | 3.65 | 3.57 | 3.51 | 3.39 | 5.28 | 4.29

H11 Cesta) Bt 3.51 | 3.42 | 3.37 | 3.28 | 3.19 | 3.04 | 2.94 | 3.52 | 3.20 | 3.14 | 3.09 | 3.03 | 2.99 | 2.91 | 5.12 | 3.70

ease_road | easement 3.37 | 3.27 | 3.20 | 3.10 | 3.00 | 2.80 | 261 | 3.38 | 3.04 | 2.95 | 288 | 280 | 2.72 | 2.54 | 5.11 | 3.62

H12 downstreant-ot 3.20 | 3.03 | 2.90 | 2.73 | 2.64 | 2.42 | 2.24 | 3.23 | 2.86 | 2.73 | 260 | 2.47 | 2.36 | 2.20 | 5.08 | 3.52
easement

H13 ponfuence 3.15 | 2.96 | 2.82 | 2.62 | 2.43 | 2.08 | 1.78 | 3.17 | 2.78 | 2.64 | 2.48 | 2.32 | 2.19 | 1.93 | 5.05 | 3.48

H14 apsiean 5.16 | 4.95 | 4.80 | 4.53 | 4.30 | 3.89 | 3.59 | 5.16 | 4.54 | 4.39 | 4.23 | 4.04 | 3.88 | 3.58 | 7.18 | 5.40

H15 Precinct L 4.90 | 4.70 | 4.55 | 4.30 | 4.07 | 3.66 | 3.36 | 4.91 | 4.33 | 4.18 | 4.02 | 3.84 | 3.69 | 3.41 | 6.84 | 5.15
upstream of

LEB3 us LEB Crossing 4.56 | 4.38 | 4.24 | 4.02 | 3.82 | 3.46 | 3.21 | 4.57 | 4.06 | 3.92 | 3.78 | 3.63 | 3.49 | 3.26 | 6.17 | 4.77
3

LEB3 se rossina | 3.907 | 4.24] 4.15 | 4.08 | ova | ma | wa | na | 4.24] ma | na | wa | wa | ma | ma | 609 | 4.35

AspPI us aepera PI 4.45 | 4.27 | 4.14 | 3.94 | 3.75 | 3.41 | 3.17 | 4.46 | 3.97 | 3.85 | 3.72 | 3.57 | 3.44 | 3.22 | 5.94 | 4.67

AspPI Aspera Pl 4.51 n/a n/a n/a n/a n/a na n/a n/a nia nia n/a n/a n/a n/a | 5.56 | 4.66

AspPI ds ee of 4.15 | 4.04 | 3.95 | 3.81 | 3.65 | 3.36 | 3.14 | 4.15 | 3.82 | 3.74 | 3.63 | 3.50 | 3.39 | 3.19 | 5.68 | 4.29
upstream of

LEB2 us LEB Crossing 4.31 | 4.18 | 4.11 | 3.99 | 3.86 | 3.61 | 3.27 | 4.31 | 3.94 | 3.86 | 3.78 | 3.67 | 3.53 | 3.17 | 6.13 | 4.49
2

LEB2 . Crossing 3.20 | 4.18 | 4.06 | 3.99 | 3.89 | 3.79 | 3.59 | 3.43 | 4.18 | 3.85 | 3.79 | 3.73 | 3.64 | 3.51 | 3.43 | 6.07 | 4.38
LEB - adjacent

LEB2 ds to hooded lots 3.70 | 3.49 | 3.36 | 3.16 | 3.00 | 2.76 | 2.57 | 3.72 | 3.23 | 3.10 | 297 | 2.84 | 2.74 | 2.56 | 5.90 | 4.03

LEB1 us upstream of 4.02 | 3.84 | 3.67 | 3.30 | 3.00 | 2.54 | 2.25 | 4.03 | 3.41 | 3.18 | 2.95 | 2.74 | 257 | 2.26 | 5.95 | 4.24
LEB Crossing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Northbrook Corporation Pty Ltd
0:15101-19-O03\wp\R1v1 Flood Study\App F - Peak Flood Levels.docx

16 October 2012

Page 2

 

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.