Council archive · source document
RFI - Kauri St Civil RFI response · MCU22/0144
28th October 2022
Ref: MCU22/0144 OPW22/0207
Ms N Gorton
PO Box 141
Tewantin, QLD 4565
Attention: Nadine Gorton
Dear Ms Schramm,
Re: Information Request
At: 9 Kauri St, Cooroy QLD, 4563
With reference to the abovementioned development application and the subsequent
information request from Council, we have prepared a response to the engineering matters
raised as follows.
Earthworks
7. Provide amended earthworks plans showing clearly where the sections are
taken from.
Please refer to the attached plans, which have added call out sections and labelling to
more clearly identify the location of each section.
Retaining Walls
8. Provide additional detail on the proposed retaining walls. The detail must
be prepared by a Registered Professional Engineer of Queensland and
include, but not be limited to:
8.1. Height of the walls;
8.2. The type of wall construction (material, foundations etc);
8.3. A section plan indicating the location of the walls and
foundations in relation to the property boundary, the proposed
building pad, finished floor level, driveway, and neighbouring
properties’ levels;
8.4. The structures required to collect and convey existing overland
flows that are impacted on by the construction of the walls;
8.5. Any fencing to be installed on top of or beside the walls;
8.6. The location of any services, above or below ground, adjacent
to the proposed walls.
The walls have been further detailed. Refer to the additional plans C56 and C57 which
provide the additional detail for the proposed retaining walls. The walls are proposed
to be made of concrete sleepers with steel post supports to be designed by a
structural engineer.
As the walls are not water tight, water will be able to pass through the spaces between
the retaining sleepers. Subsoil ag lines collected groundwater from behind the wall,
discharging directly to nearby pits, while the small amount of overland flows from
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
upstream of the walls will drain over the walls, to be collected in the internal drainage
system to be conveyed through site.
Where the retaining wall crosses the existing sewer, the sewer is to be bridged and
the footings are to be designed to ensure that no load is transferred into the zone of
influence of the pipe.
9. Provide amended, detailed plans of the proposed driveway and internal
roadways’ works clearly showing where the cross sections are taken from and
where the longitudinal sections apply.
Please refer to the attached plans which provide further clarification of the driveway
labelling and location for sections.
10. Clarify levels (including for retaining walls on all cross-sections), what
“OFFSET” in plan C55 refers to, standardise terminology and suitably cross
reference between plans.
Please refer to the attached plans which provide further clarification of these details.
Offset refers to the offset from the control line (represented by label ‘C’ or offset 0) for
the typical cross sections. The terminology is standardised and additional labelling
has been included to indicate height of walls and location of cross sections shown.
11. Provide vehicles swept paths (vehicle B99 as described in
AS/NZS2890.1:2004) for each unit which demonstrate that the garage
carparking space can be accessed in a forward gear, vehicles can reverse from
the space and exit the site in a total of 3 movements.
The design has been updated and the swept paths revised to demonstrate the
garages can be accessed by a B99 vehicle in forward gear, entering and leaving the
site in no more than three movements. The only exception is unit one, for which a B99
would only be able to enter and exit in three movements using a reverse entry into the
garage, which is permitted by AS2890.1 under clause B4.3 for residential and
domestic car parking. B85 vehicles are nonetheless able to enter and exit in forward
gear, as shown in the attached plans.
12. Provided an updated SWMP with a revised stormwater quantity assessment
which justifies the assumed pervious site areas post-development and which
is consistent with the proposal plans.
The catchment areas and stormwater management plan have been updated with the
correct values based on the current architectural layout. With the revised areas and
updated modelling, a larger tank of minimum 54m³ is required to provide the
necessary attenuation for the development.
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Page 3
13. Provide updated OPW plans which:
• fully contain the bioretention device within communal open space; and
• provide details of the proposed high-flow outlet from the basin and
downstream scour protection and flow dissipation in order to demonstrate
how flows will be discharged to downstream land without causing
concentration of flow or scour; and
• Revise and confirm the in-situ infiltration rate and whether this is suitable for
a ‘pipeless’ bioretention basin; and
• If a pipeless bioretention basin is suitable, revies the basin section to
encourage infiltration by having a flatter basin surface and provide some
extended detention depth.
The updated plans provide additional information to detail the bioretention area.
Details of the weir outlet have been provided which rely on a 1.4m wide rock spillway
to discharge run-off at the south eastern corner of the site. Based on the survey,
natural surface grades are typically around 5% at this location, therefore downstream
scour is considered unlikely, and the rock outlet will assist by dissipating energy from
the overflow and dispersing run-off from the outlet.
Based on the previous geotechnical analysis, the soils at the location have a saturated
hydraulic permeability of 0.0998cm/min, equivalent to 59.88mm/hour of infiltration
capacity. The MUSIC modelling has been updated to reflect this, and in turn a smaller
bioretention garden will achieve the required pollutant reduction targets. To
encourage infiltration, a typical 1% surface grade to the garden has been applied, and
200mm of extended detention depth is available below the weir spillway level.
For further details on the other items of the information request, please refer to the town
planning response.
We believe that the above satisfactorily addresses the engineering matters raised in the
information request however, should additional information be required, please contact
our office directly.
Yours faithfully,
RECOR Pty Ltd
Prepared by
Ben Parry
Civil Engineer
BEng (Hons), MIEAust CPEng NER
RPEQ: 28084
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
Used in these records
RFI - Kauri St Civil RFI response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 149 KB (small file)
- File type
No other editions are linked here.