RFI - Kauri St Civil RFI response · MCU22/0144
upstream of the walls will drain over the walls, to be collected in the internal drainage
system to be conveyed through site.
Where the retaining wall crosses the existing sewer, the sewer is to be bridged and
the footings are to be designed to ensure that no load is transferred into the zone of
influence of the pipe.
9. Provide amended, detailed plans of the proposed driveway and internal
roadways’ works clearly showing where the cross sections are taken from and
where the longitudinal sections apply.
Please refer to the attached plans which provide further clarification of the driveway
labelling and location for sections.
10. Clarify levels (including for retaining walls on all cross-sections), what
“OFFSET” in plan C55 refers to, standardise terminology and suitably cross
reference between plans.
Please refer to the attached plans which provide further clarification of these details.
Offset refers to the offset from the control line (represented by label ‘C’ or offset 0) for
the typical cross sections. The terminology is standardised and additional labelling
has been included to indicate height of walls and location of cross sections shown.
11. Provide vehicles swept paths (vehicle B99 as described in
AS/NZS2890.1:2004) for each unit which demonstrate that the garage
carparking space can be accessed in a forward gear, vehicles can reverse from
the space and exit the site in a total of 3 movements.
The design has been updated and the swept paths revised to demonstrate the
garages can be accessed by a B99 vehicle in forward gear, entering and leaving the
site in no more than three movements. The only exception is unit one, for which a B99
would only be able to enter and exit in three movements using a reverse entry into the
garage, which is permitted by AS2890.1 under clause B4.3 for residential and
domestic car parking. B85 vehicles are nonetheless able to enter and exit in forward
gear, as shown in the attached plans.
12. Provided an updated SWMP with a revised stormwater quantity assessment
which justifies the assumed pervious site areas post-development and which
is consistent with the proposal plans.
The catchment areas and stormwater management plan have been updated with the
correct values based on the current architectural layout. With the revised areas and
updated modelling, a larger tank of minimum 54m³ is required to provide the
necessary attenuation for the development.
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Kauri St Civil RFI response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 149 KB (small file)
- File type
No other editions are linked here.