Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2016-12-06 Planning & Environment Committee Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 6 DECEMBER 2016


RECOMMENDATION
That Council note the report by the Coordinator Engineering to the Planning & Environment
Committee Meeting dated 6 December 2016 regarding Application No. OPW16/0177 for a
Development Permit for Operational Works – Jetty and Boatlift situated at 1/17 Sunseeker Close,
Noosaville and approve the application in accordance with the following conditions:
      Approved Plans
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table unless
      otherwise amended by these conditions.
       Plan No.              Rev.   Plan/Document Name                            Date
       26231-J1              C      Jetty Plan and Details prepared by SCG        12 October 2016
                                    Consulting Engineers as annotated by
                                    Council
       D15                          Typical 1.5 Tonne Drive On Pontoon            29 May 2003
                                    prepared by Superior Jetty Constructions
2.    Boats moored at the structure must not extend beyond the prolongation of the side
      boundaries of the subject site.
3.    All structures must be designed and constructed such that they are free standing within the
      waterway and are not connected to or behind the revetment wall
4.    All structures must have no detrimental effects on stormwater drains and/or easements.
5.    Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
      revetment wall.
6.    A rigid handrail must be fitted on one side of the walkway.
7.    No posts or vertical supports of the proposed jetty are to extend vertically from the structure
      unless they provide support for the handrail.
8.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
      beyond the revetment wall unless all switches and power outlets are positioned above the
      1%AEP flood level.
9.    Lighting associated with the use must be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10.   Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
      5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
      10.1. Located clear of this rock protection where applicable, or alternatively
      10.2. Where the scour protection extends beyond 750mm:
             10.2.1. Prior to driving piles, the rocks are to be removed to expose the geotextile
                     and the geotextile cut neatly to allow it to be turned back. During pile driving,
                     care is to be taken to ensure the geotextile is not damaged. At the
                     completion of pile driving, the fabric is to be turned down around the pile and
                     the rocks replaced around the piles
11.   The jetty and boat lifting device are to be used for private purposes only with no
      commercial operations to be undertaken.
12.   Boat repair activities are not permitted on site.
13.   Wastewater and sullage must only be disposed of at approved pump out facilities.
14.   The mooring facility must not be utilised for live-aboard purposes.




                                                                                       Page 27 of 83
Log in to download the original file

2016-12-06 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.