2016-12-06 Planning & Environment Committee Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 DECEMBER 2016


     62.   Where excavations of non-imported soils below the elevation of 5m AHD are
           necessary for construction, the application for Operational Works for Bulk
           Earthworks, Stormwater and /or Landscaping must demonstrate and include
           certification from a suitably experienced and qualified geotechnical engineer of
           methods necessary to ensure construction and operation of the development:
           a.   is consistent with Queensland Acid Sulfate Soil Technical Manual: Soil
                Management Guidelines; and
           b.   will not result in the release of acid or associated metals; and
           c.   will not cause localised lowering of groundwater.
     72.   The development must provide waste storage and disposal facilities in accordance
           with Planning Scheme Policy 9, Waste Management, including:
           a.   an external imperviously paved area correctly sized for all refuse and recycling
                containers and suitably screened from public places and neighbouring
                properties.
           b.   a bin wash area with a cold-water tap, hose and drain outlet connected to
                sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
                water entry to the sewerage system which can be achieved by a bunded area,
                with a nib wall height of 100mm maximum, enclosing a wash area of 700mm x
                700mm minimum (max 0.7m²). Alternatively, the waste area can be roofed, or
                another appropriate design approved by Council.
     73.   A Waste Management Plan (Operational) in accordance with Planning Scheme
           Policy No. 9 Waste Management and Planning Scheme Policy 11, Waste
           Management Plans* must be submitted for the day-to-day operation of the
           development and approved by Council’s Waste and Environmental Health Section,
           prior to issue of development permit for operational works.
           The Plan must include the following information: -
           a.   types of wastes that will be generated from the activities approved within the
                development.
           b.   estimated volumes or tonnage of both recyclables and waste generated.
           c.   methods to be used for dealing with garden waste.
           d.   initiatives to minimize waste either by waste prevention, reduction, re-use or
                recycling.
           e.   description of procedures for getting all waste to the bins; the storage of bins
                and the collection of bins by the contractor.
           f.   description of the design details of waste storage and recycling areas including
                size, location, elevation and floor plan, methods of bin washing and system to
                prevent storm water getting into sewer via the bin wash.
           g.   description of types and volume of waste storage containers to be used.
           h.   waste and recycling storage area shall include the provision of containers for all
                waste and recycling materials including putrescible matter, non-recycling waste,
                paper/ cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc,
                and bin washing facilities connected to sewer.
           i.   detailed description of vehicular access routes to collect waste. Where
                collection is off street, access must allow vehicles to enter and leave the site in
                a forward direction.
C.   Refuse to change conditions 52 & 55 as Unitywater has advised that the conditions are
     appropriate at this stage.

                                                                                   Page 41 of 83
Log in to download the original file

2016-12-06 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.