Original source · versioned page text
2016-12-06 Planning & Environment Committee Agenda
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 DECEMBER 2016
REPORT
1. PROPOSAL
The applicant seeks to change an existing development permit for a Material Change of Use for a
Resort of 155 Multiple Dwelling Units & Associated Facilities (Theatre, Restaurant, Shops &
Function Rooms) on the site. This approval was recently modified by Council on March 2016
with changes including a general redesign of building layouts to increase efficiency and
consolidate non residential components and remove theatre and function room components of
the approval.
The applicant is now seeking approval to further change the development permit with the
alterations to include a change to the description of the development, changes to the approved
plans and changes to the conditions of approval.
As a result of discussions with Council staff on 21 October 2016 concerning the proposed
changes, the applicant submitted amendments to the staging plan, bushfire management plan,
engineering stabilisation works and carparking. The changes sought to the approval now include:
Change the description of the development to reflect the amended approval of March 2016
which approved removal of the Theatre use from the description of development. The
change suggested by the applicant also removes reference to the term ‘Resort’. The new
description of the development proposed is:
Material Change of use – 151 Multiple Dwelling Units and Associated Facilities –
Shop, Restaurant, Multi- Function Room and Gym
Reduce the overall number of dwelling units from 155 to 151.
Reduce the number of persons from 421.4 to 404.
Increase GFA from 17,571m2 to 18,610m2 (original approval noted as 21,950m2).
Alter the provision of carparking on site.
Remove H & I Blocks as a result of redesign of Blocks D-G and associated driveway and
carparking areas.
Minor redesign of central communal facilities.
Introduce staging to the approval as follows:
Page 42 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.