Council archive · source document
Delegated Report - Code - Planning MCU25 0087 (As Published) · MCU25/0087
WD.602 DA2 Sections B & D 19.12.2025
WD.603 DA2 Section C 19.12.2025
Building Height
3. The maximum height of the development must not exceed 8.0 metres above the ground level
including where excavation is undertaken.
4. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the building does not exceed the maximum height requirement of this Decision
Notice.
Site Access and Driveways
5. A sealed access driveway must be provided from The Esplanade to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval, and must include in particular:
a. a driveway crossover in accordance with Council standard drawings RS-049 and RS-
050
Stormwater Drainage
6. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge without causing scour or damage to the subject site or any
adjoining properties.
Easements
7. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
8. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service authority,
the easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
9. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
10. All works must be carried out in accordance with the recommendations contained in
Tectonic’s Geotechnical Investigation (25289-001-Rev0) dated 19 November 2025 and
endorsed as part of the building approval.
11. A dilapidation survey must be carried out of all adjacent properties, structures and
infrastructure prior to the commencement of works and endorsed as part of the building
approval.
Earthworks and Retaining Walls
12. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be contained entirely within the subject site unless
written permission form the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
13. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
14. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
Page 14 of 18
Document Set ID: 24546364
Version: 9, Version Date: 24/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0087 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.