b. No decorative outdoor lighting is to be fitted to the buildings, open space or recreation
areas (e.g. Fairy/Christmas lights) during nesting and hatching season (October –
May).
c. Pool lighting must be switched off after 8:00pm during nesting and hatching season
(October – May).
d. All exterior lighting must be shielded by a minimum of 30 cm vertical shielding.
18. Certification must be submitted to Council which certifies that the lighting requirements of
this Decision Notice have been met.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
25289-001 0 Geotechnical Investigation, prepared by 19/11/2025
Tectonic
B 17 The Esplanade, Sunshine Beach – 10/11/2025
Coastal Hazard Assessment, prepared by Moffatt
and Nichol
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Building and Construction Industry (Portable Long Service Leave) Levy
2. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Preparation of a Preliminary Construction Management Plan
3. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
Performance Bond Agreement
Page 16 of 18
Document Set ID: 24546364
Version: 9, Version Date: 24/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0087 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.