Letter to NC - Response to information request · OPW25/0206

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                                          Court Appeals & Dispute Resolution
                                                                          Applications & Assessment
                                                                          Due Diligence & Compliance
                                                                          Project Management
                                                                          General Development Advice




Tuesday, 14th of April 2026
Our Ref: 23046
Council Ref: MCU22/0118

Noosa Council
PO Box 141
Tewantin QLD 4565
By Email: [email protected]

Attention: Stacey Clohesy, Development Officer

Dear Stacey,

Response to Information Request - Development Application for Operational Work
(Vegetation Clearing - Selective Tree Clearing) for Short-term accommodation (15 Eco-
Cabins) at the “RACV Noosa Resort”, 94 and 142 Noosa Drive, Noosa Heads,

Reference is made to the request for further information by Noosa Council dated 27 January
2026. The applicant has considered the request and provides the following responses.

Information Required

Item – Updated Concept Construction Tree Management Plan - laydown areas (condition 3)

Condition 3 (approved plans) of the final Judgment (Appeal No. 3746 of 2023), required the
Concept – Construction and Tree Management Plan (Plan no. AP241011, rev 01, dated 27 Nov
2024) to be updated to:
   i.      Amend to include the revised development layout.
   ii.     Provide any updated construction laydown / construction methodologies to
           accommodate layout changes.

An updated Concept – Construction and Tree Management Plan (dated 18 December 2025, rev
03) was submitted. This provides nominated laydown areas (x4) in the Construction Management
Plans (Attachment D).

Information Required




                        Adamson Town Planning Pty Ltd
                               (ACN: 163 798 374 | ABN: 73 163 798 374)
                         M| 0437 754 420 Mail: PO Box 894, Cooroy QLD 4563
                     ‘Noosa Boardroom’, 28 Eenie Creek Road, Noosaville QLD 4566
          Email| [email protected] Web| www.adamsontownplanning.com.au
Full text of the other 5 pages

Page 2

 “Adamson Town Planning, specialising in providing higher order town planning advice”




    1. The laydown area in the southern section of the lot, adjacent to Cabins 6 & 7, is located
       within the nominated building setback area to be kept free from development. This area
       is located in close proximity to several trees nominated for retention and adjacent to a
       small population of Fraser Island Vine Tecomanthe hillii (listed as a near threatened
       species under the Nature Conservation Act 1992).

        Please provide an updated Construction Management Plan showing all laydown areas
        outside the building setback area and within the approved disturbance footprint.

Response:

The applicant has provided an amended Concept – Construction and Tree Management Plan
with the material lay down area beside Cabins 6 & 7 removed from the road reserve (refer to
the Construction Methodology Plan – Stage 1 - Attachment 1). The project architect has
advised that while this additional material laydown area would have been helpful during
construction, the other laydown areas can be utilised as required.

Item – Evacuation Plan (condition 53)

In accordance with condition 53 of the final Judgment (Appeal No. 3746 of 2023), an Evacuation
plan for the site must be prepared by a qualified person and submitted to Council
prior to the issue of any Development Permit for Operation Works.

An Emergency Management Plan was submitted with the application. This plan relates to the
existing resort and has not yet been updated to include the subject site. The application states
the plan has not yet been updated due to the requirement of further detailed design.

Information Required

    2. An updated Emergency plan must be submitted to include the subject development site.

Response:

The applicant has updated the Emergency Management Plan (EMP) for the existing Noosa
Resort and including the proposed 15 Eco-Cabins (refer Attachment 2A & Assembly Plan
Attachment 2B). The EMP addresses natural disasters including flooding and severe storm
events, including cyclones, bushfire and earthquakes, as well as a multitude of other
issues/scenarios required to be addressed for a similar scale of development that provides for
short-term accommodation in this location.

Item – Preliminary Construction Management Plan (Advisory note 11)

In accordance with Advisory Note 11 of the final Judgment (Appeal No. 3746 of 2023), a
Preliminary Construction Management Plan is required to be submitted with the Operational

                                                                                        2|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)

Page 3

 “Adamson Town Planning, specialising in providing higher order town planning advice”




Works application. This includes requirements in addition to those provided in the Concept –
Construction and Tree Management Plan.

Information Required

    3. Please provide a Preliminary Construction Management Plan addressing all
       requirements outlined in Advisory note 11 of the final Judgment (Appeal No. 3746 of
       2023).

Response:

The applicant has provided a Construction Management Plan for the development, which is
directly related to the operational works for selected tree clearing only and will be undertaken
by Biodiverse Environmental (refer Attachment 3). It is intended to provide another CMP for
the construction of the eco-cabins, including a Traffic Management Plan consistent with
Manual of Uniform Traffic Control Devices (MUTCD). The traffic management for the tree
clearing is to occur in accordance with Appendix 3 – Pedestrian and Traffic Management Plan.

It is suggested that a full Traffic Management Plan (MUTCD) is not required for the tree clearing
component, which is to occur wholly within the site, with access to the operational area well
removed from Noosa Drive. The tree clearing works can be readily managed within the
proposed parking area for the eco-cabins to prevent any offsite traffic impacts with work also
occurring over a relatively short period.

General Advice

Item – Performance bonds (condition 20)

In accordance with condition 20 of the final Judgment (Appeal No. 3746 of 2023), a performance
bond is required prior to the issue of a Development Permit or Operational Works.

Advice

    1. Security in the form of a cash bond or trading bank guarantee to the sum outlined in the
       final Judgment (Appeal No. 3746 of 2023), must be submitted to Council. It is noted that
       this condition must be satisfied prior to the issue of the subject Operational Works
       approval for vegetation clearing.

Response:

The applicant will be providing the bond as required by the development approval prior to the
issue of the development permit for operational works. It is expected that bond will be lodged
as soon as possible.



                                                                                        3|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)

Page 4

 “Adamson Town Planning, specialising in providing higher order town planning advice”




Item – Waste disposal (condition 37)

In accordance with condition 37 of the final Judgment (Appeal No. 3746 of 2023), prior to the
issue of any Operational Works approvals, an operational waste management plan must be
submitted to Council.

Advice
   2. It is acknowledged that an Operational Waste Management Plan was submitted with this
       application. For the purposes of assessing this Operational Works application, the
       submitted Waste Management Plan is accepted in its current form.
       Please note that this plan will be subject to further review as part of a subsequent
       Operational Works application to be lodged for other aspects of the development,
       including (but not limited to) earthworks, access and servicing, car parking, stormwater
       drainage, water quality management, and landscaping, as required by the conditions of
       approval.
       Additional information or amendments to the Waste Management Plan may be required
       at that stage to facilitate assessment and achieve compliance with Council’s
       requirements.

Response:

Please find attached an updated Operational Waste Management Plan for the proposed 15
eco-cabins (refer Attachment 4). This includes the calculation of the primary waste streams
and quality calculations for the development, which is expected to be 60L/cabin/week as per
Table 1, bin dimensions and spacing requirements provided in Table 2 and the waste collection
schedule provided in Table 3. The location of the bin storage area is shown in Figure 2 near
the proposed eco-cabins in a logical and accessible location. The existing bin wash down area
within the Noosa RACV Resort will be utilised for the cleaning of the bins for the eco-cabins.

Item – Weed management (condition 43)

In accordance with Condition 43 of the final Judgment (Appeal No. 3746 of 2023), initial
treatment of all woody weeds and vines (including frangipani vine) on the site is required, with
specific actions and timeframes detailed in parts (a) to (c) of the condition. To date, the
requirements of part (a) (treatment undertaken prior to 11 December 2025) and part (b) (Council
inspection undertaken on 12 December 2025) have been satisfied.

Advice

    3. In accordance with Condition 43(c), a report on the effectiveness of the treatment must
       be provided to Council before 6 February 2026. Following receipt of the report, Council
       is required to inspect the site to verify the treatment before 13 February 2026. Depending
       on the outcomes of the report and Council’s site inspection, further weed management
       may be required.

                                                                                        4|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)

Page 5

 “Adamson Town Planning, specialising in providing higher order town planning advice”




Response:

In accordance with condition 43, the RACV Weed Management Compliance report was
submitted on 3 February 2026. Biodiverse Environmental has confirmed that the treatment of
Frangipani vine and associated weed species was undertaken between October 2025 and
January 2025 using the methods described in the site reports and applied in accordance with
the Weed Management Plan (WMP), which is recognised as best-practice weed control. It has
been concluded that, based on visual monitoring and observed reductions in weed density
and regrowth, the treatment has been effective.

Item – SARA referral

The application for a Material Change of Use (MCU) triggered referral to the State Assessment
and Referral Agency (SARA) under the Planning Regulation 2017, specifically:

    •    Schedule 10, Part 10, Division 3, Subdivision 3, Table 1, Item 1 – Development interfering
         with koala habitat in koala habitat areas outside koala priority areas.

A response was received from SARA (Ref. 2208-30467 SRA), including referral agency
conditions.

Advice

    4. The Operation Works application for vegetation removal may require re-referral due to
the following:
         i.    A new application has been lodged (Operational Works); and/or
         ii.   The existing referral agency conditions (SARA ref. 2208-30467 SRA, Attachment
               1, Referral agency conditions) reference superseded plans, and the updated plans
               have since been amended slightly

Response:

In accordance with previous advice provided to the Council, the application has been referred
to the State Assessment Referral Agency (SARA), with a Referral Confirmation Notice being
provided on 23 February 2026. The applicant has also responded to the information request
made by SARA on 9 March 2026. A copy of the response to the information request is provided
as Attachment 5. The further advice provided to SARA is entirely consistent with the advice
provided with the development application.




                                                                                        5|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)

Page 6

 “Adamson Town Planning, specialising in providing higher order town planning advice”




Should you require further information or have any concerns with the proposed development,
please contact me.

Yours faithfully




Shane Adamson (BEngTech, GDURP, MPIA, MQELA)
Town Planning Specialist
Director - Adamson Town Planning Pty Ltd




                                                                                        6|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)

Used in these records

About this file

File size
293 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Letter to NC - Response to information request.pdf · 293 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.