Letter to NC - Response to information request · OPW25/0206
“Adamson Town Planning, specialising in providing higher order town planning advice”
1. The laydown area in the southern section of the lot, adjacent to Cabins 6 & 7, is located
within the nominated building setback area to be kept free from development. This area
is located in close proximity to several trees nominated for retention and adjacent to a
small population of Fraser Island Vine Tecomanthe hillii (listed as a near threatened
species under the Nature Conservation Act 1992).
Please provide an updated Construction Management Plan showing all laydown areas
outside the building setback area and within the approved disturbance footprint.
Response:
The applicant has provided an amended Concept – Construction and Tree Management Plan
with the material lay down area beside Cabins 6 & 7 removed from the road reserve (refer to
the Construction Methodology Plan – Stage 1 - Attachment 1). The project architect has
advised that while this additional material laydown area would have been helpful during
construction, the other laydown areas can be utilised as required.
Item – Evacuation Plan (condition 53)
In accordance with condition 53 of the final Judgment (Appeal No. 3746 of 2023), an Evacuation
plan for the site must be prepared by a qualified person and submitted to Council
prior to the issue of any Development Permit for Operation Works.
An Emergency Management Plan was submitted with the application. This plan relates to the
existing resort and has not yet been updated to include the subject site. The application states
the plan has not yet been updated due to the requirement of further detailed design.
Information Required
2. An updated Emergency plan must be submitted to include the subject development site.
Response:
The applicant has updated the Emergency Management Plan (EMP) for the existing Noosa
Resort and including the proposed 15 Eco-Cabins (refer Attachment 2A & Assembly Plan
Attachment 2B). The EMP addresses natural disasters including flooding and severe storm
events, including cyclones, bushfire and earthquakes, as well as a multitude of other
issues/scenarios required to be addressed for a similar scale of development that provides for
short-term accommodation in this location.
Item – Preliminary Construction Management Plan (Advisory note 11)
In accordance with Advisory Note 11 of the final Judgment (Appeal No. 3746 of 2023), a
Preliminary Construction Management Plan is required to be submitted with the Operational
2|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Letter to NC - Response to information request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 293 KB (small file)
- File type
No other editions are linked here.