Council archive · source document
Letter to NC - Response to information request · OPW25/0206
“Adamson Town Planning, specialising in providing higher order town planning advice”
Item – Waste disposal (condition 37)
In accordance with condition 37 of the final Judgment (Appeal No. 3746 of 2023), prior to the
issue of any Operational Works approvals, an operational waste management plan must be
submitted to Council.
Advice
2. It is acknowledged that an Operational Waste Management Plan was submitted with this
application. For the purposes of assessing this Operational Works application, the
submitted Waste Management Plan is accepted in its current form.
Please note that this plan will be subject to further review as part of a subsequent
Operational Works application to be lodged for other aspects of the development,
including (but not limited to) earthworks, access and servicing, car parking, stormwater
drainage, water quality management, and landscaping, as required by the conditions of
approval.
Additional information or amendments to the Waste Management Plan may be required
at that stage to facilitate assessment and achieve compliance with Council’s
requirements.
Response:
Please find attached an updated Operational Waste Management Plan for the proposed 15
eco-cabins (refer Attachment 4). This includes the calculation of the primary waste streams
and quality calculations for the development, which is expected to be 60L/cabin/week as per
Table 1, bin dimensions and spacing requirements provided in Table 2 and the waste collection
schedule provided in Table 3. The location of the bin storage area is shown in Figure 2 near
the proposed eco-cabins in a logical and accessible location. The existing bin wash down area
within the Noosa RACV Resort will be utilised for the cleaning of the bins for the eco-cabins.
Item – Weed management (condition 43)
In accordance with Condition 43 of the final Judgment (Appeal No. 3746 of 2023), initial
treatment of all woody weeds and vines (including frangipani vine) on the site is required, with
specific actions and timeframes detailed in parts (a) to (c) of the condition. To date, the
requirements of part (a) (treatment undertaken prior to 11 December 2025) and part (b) (Council
inspection undertaken on 12 December 2025) have been satisfied.
Advice
3. In accordance with Condition 43(c), a report on the effectiveness of the treatment must
be provided to Council before 6 February 2026. Following receipt of the report, Council
is required to inspect the site to verify the treatment before 13 February 2026. Depending
on the outcomes of the report and Council’s site inspection, further weed management
may be required.
4|Page
18006 – RACV Noosa Resort, Operational Works (Tree Clearing)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Letter to NC - Response to information request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 293 KB (small file)
- File type
No other editions are linked here.