Council archive · source document
Permissible Change Decision Notice Approval or App in Part - 010.2006.00001168.002 [As Published] · 132006.1168.02
2006/1168
49. The property owner will be responsible for any cost incurred by an approved Cleaning
Contractor relating to the cleaning, servicing and contents removal from the grease arrestor,
where access to the arrestor is impaired or delayed.
50. The Trade Waste application fee of ($105.00) is required at the time of the application.
51. Trade Waste requirements are required to be in place, inspected and approved prior to the
commencement of trading or operation. The appropriate Trade Waste Permits will be issued
following approval at final inspection.
52. A place of food preparation and/or cooking is to have the liquid waste connected to a Trade
Waste line, that discharges to an approved grease arrestor of a size determined by Council’s
Trade Waste Policy.
53. All liquid waste produced by the commercial section of the development is “Trade Waste” and
is to be treated as required under the Noosa Trade Waste Policy prior to release to the sewer.
Environmental Services
54. Construction activities must be undertaken pursuant to The Sunshine Coast Regional Council
Girraween Sports Precinct Environmental Management Plan (Construction) by GHD dated
July 2010.
An Operational Phase Environmental Management Plan (OEMP) must be prepared to guide
management of the site to protect and enhance environmental values of the site and
surrounding lands during the Operational Phase of development. The OEMP must be
approved by the Co-ordinator for Environment and Landscape and Co-Ordinator Hydraulics
and Water Quality prior to commencement of use.
The development must be operated pursuant to the approved Operational Phase
Environmental Management Plan
55. The Operational Phase Environmental Management Plan (OEMP) must address the following
issues in relation to operational phases of the development:
a. Legislative compliance;
b. Flora and fauna protection including;
i. ongoing protection of area to the south east of the site containing populations of
native plants, Macarthuria complanata, and scheduled “Rare” under the Nature
Conservation Act 1992; and
ii. effects of light spill on fauna within the adjoining Giraween National Park.
c. Weed & pest control;
d. Water quality protection; including ongoing maintenance of water quality treatment
structures and maintenance of their outlets;
e. Groundwater quality and quantity protection;
f. Litter and Waste management;
g. Amenity (visual, noise, etc) management; and
h. Bushfire control, including the need for any buffers being located within the
development footprint and not encroaching into the adjoining vegetation.
The OEMP must include Performance Objectives, Management Strategy (including relevant
conditions specified herein), Monitoring Requirements and an annual review of the
Management Strategy (to ensure Performance Objectives are achieved). This OEMP must be
submitted by the applicant for approval by the Co-ordinator for Environment and Landscape
and Co-Ordinator Hydraulics and Water Quality prior to commencement of use
56. The lights shall not be used between the times specified below:-
Page 9 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Permissible Change Decision Notice Approval or App in Part - 010.2006.00001168.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 366 KB (small file)
- File type
No other editions are linked here.