SPECIAL MEETING AGENDA                                                        31 AUGUST 2020


         2.4. provision of stormwater easements on Lots 8 and 9 and in accordance with
              condition 27;
         2.5. provide an access easement named AF for access to proposed Lot 24 as
              required by condition 36(a).
    3.   All lot numbering on the subdivision plan to be submitted to Council for plan sealing
         must remain as shown on the Approved Plans.
         Currency Period
    4.   The Currency Period for this development approval lapses if all conditions have not
         been complied with, and the plan of survey lodged with Council for endorsement by 31
         August 2024, unless an application to extend the currency period is approved by
         Council.
         Acoustic Measures for Residential Lots & Office Lot
    5.   Prepare and submit to Council for approval with an Operational Works application a
         revised acoustic report which includes measures to mitigate noise generate from the
         shopping centre operations and equipment, including deliveries, truck movements and
         rubbish collection. This report should consider attenuation at the noise source as well
         as a noise barrier along the shared boundary of Lots 19 and 21. All measures to
         mitigate noise must be implemented prior the submission of the subdivision plan to
         Council.
         Noise attenuation is required to achieve the following acoustic quality for potential
         residential uses on Lots 17-19. The measurement location must include receivers
         being placed at the closest point to the future residential and office buildings.
                                                        Criteria (measured at the receptor) dB(A)
           Sensitive receptor        Time of Day
                                                         LAeq,adj,1hr 1          LA1,adj,1hr2
                                 Daytime and evening
                                                               35                    45
                                  (habitable spaces)
           Dwelling (indoors)
                                      Night-time
                                                               30                    40
                                   (sleeping areas)
         1Acoustic descriptor/noise target for continuous noise sources (eg. Mechanical plant).
         2Acoustic    descriptor/noise target for transient impacts arising from loading dock
         activities (e.g. truck movements, reversing alarms, compactor, trolley etc.)
         Water & Sewer Connections
    6.   An underground connection to reticulated water and sewerage must be provided to
         each lot in accordance with the standards and requirements of Northern SEQ
         Distributor–Retailer Authority (Unitywater).
         A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
         (Unitywater) must be submitted to Council that certifies an underground connection to
         reticulated water and sewerage has been provided to each lot.
         External Works
    7.   Prior to the sealing of the survey plan a vehicle access to proposed Lot 23 must be
         constructed at no cost to Council. The works must be undertaken in accordance with
         an Operational Works approval, be generally in accordance with drawing number 1856-
         R08 Revision J prepared by Barlow Shelley and include an access extending from the
         existing roundabout in Walter Hay Drive to the property boundary.
    8.   Prior to the sealing of the survey plan a new emergency vehicle exit from proposed Lot
         23 must be constructed at no cost to Council. The works must be undertaken in
         accordance with an Operational Works approval. The exit must extend from the
         property boundary to the existing formation of the south bound lanes of Walter Hay
         Drive and be for emergency vehicles only. The exit must:

                                                                                  Page 16 of 35
Log in to download the original file

2020-08-31 Special Meeting Agenda(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.