SPECIAL MEETING AGENDA                                                        31 AUGUST 2020


    28.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval in compliance with the relevant sections of Queensland Urban
          Drainage Manual.
    29.   Stormwater runoff from the development must be controlled and disposed of into a
          lawful point of discharge and in a manner that does not cause scour or damage to the
          subject site or any adjoining property including Council’s drainage system.
    30.   Any drainage line or stormwater outlet located within the adjoining vegetation covenant
          or easement area must be aligned to minimise the impacts on existing vegetation with
          the final alignment determined on-site in agreement with Council’s delegate.
    31.   Streetscape bioretention devices are to be detailed with the Operational Works
          application and are to specifically address the following:
          a.   are designed generally in accordance with the Bioretention Technical Design
               Guidelines,
          b.   are designed generally in accordance with IPWEQA Standard Drawing No.
               WSUD-001 are provided with a free-draining outlet from the sub-soil drainage
               system,
          c.   are designed with offsets to underground services in accordance with utility
               services provider’s requirements,
          d.   allow for the safe movement of pedestrians along the road verge either through
               provision of a path behind the device or pedestrian refuge in the case of no path
               being provided,
          e.   have stable batter slopes which are designed to avoid the need for safety fencing
               or bollards, or incorporate grates,
          f.   have plantings setback from the road pavement a sufficient distance to not affect
               the road pavement during operation or re-setting,
          g.   are designed with a connection from the kerb to the filter media surface which is
               sufficiently robust and not prone to blockage.
    32.   All stormwater quality treatment devices contained in private lots must be maintained
          in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
          Assets (Version 1). The approved Operational Works drawings for the stormwater
          quality treatment system and detailed life cycle costing of the system must be attached
          as an addendum to this document. Records of all maintenance activities undertaken
          must be kept and made available to Council upon request.
          Electricity and Telecommunication Services
    33.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    34.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    35.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and all
          applicable legislation at the time of construction.




                                                                                  Page 20 of 35
Log in to download the original file

2020-08-31 Special Meeting Agenda(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.