SPECIAL MEETING AGENDA 31 AUGUST 2020
28. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval in compliance with the relevant sections of Queensland Urban
Drainage Manual.
29. Stormwater runoff from the development must be controlled and disposed of into a
lawful point of discharge and in a manner that does not cause scour or damage to the
subject site or any adjoining property including Council’s drainage system.
30. Any drainage line or stormwater outlet located within the adjoining vegetation covenant
or easement area must be aligned to minimise the impacts on existing vegetation with
the final alignment determined on-site in agreement with Council’s delegate.
31. Streetscape bioretention devices are to be detailed with the Operational Works
application and are to specifically address the following:
a. are designed generally in accordance with the Bioretention Technical Design
Guidelines,
b. are designed generally in accordance with IPWEQA Standard Drawing No.
WSUD-001 are provided with a free-draining outlet from the sub-soil drainage
system,
c. are designed with offsets to underground services in accordance with utility
services provider’s requirements,
d. allow for the safe movement of pedestrians along the road verge either through
provision of a path behind the device or pedestrian refuge in the case of no path
being provided,
e. have stable batter slopes which are designed to avoid the need for safety fencing
or bollards, or incorporate grates,
f. have plantings setback from the road pavement a sufficient distance to not affect
the road pavement during operation or re-setting,
g. are designed with a connection from the kerb to the filter media surface which is
sufficiently robust and not prone to blockage.
32. All stormwater quality treatment devices contained in private lots must be maintained
in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
Assets (Version 1). The approved Operational Works drawings for the stormwater
quality treatment system and detailed life cycle costing of the system must be attached
as an addendum to this document. Records of all maintenance activities undertaken
must be kept and made available to Council upon request.
Electricity and Telecommunication Services
33. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
34. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
35. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Page 20 of 35