Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Searches

Attached to the e-mail Suspend appeal period & make Change Representations - Dwelling House- MCU22/0032 - 4 Tristania Dr MARCUS BEACH.

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Type of Works                         Clearance to Physical Location of Optus Asset

                                      Not to cross the Optus asset without an Accredited Optus Asset Locator physically
                                      exposing the Optus asset and with an Optus representative onsite.

Heavy vehicle Traffic (over 3         Not to be driven across Optus conduits with less than 600mm of cover.
tonnes)
                                      Not to be driven across Optus direct buried cable with less than 1.2 meters of cover.

                                      Once off crossings permitted, multiple crossing (e.g. road construction or logging) will
                                      require Optus approval.

                                      Accredited Optus Asset Locator to physically expose the Optus asset to verify actual
                                      depth.

Mechanical Excavators, Farm           Not within 1 meter.
Ploughing, Vertical Hole
                                      Accredited Optus Asset Locator to physically expose the Optus asset to verify actual
installation for water bore or
                                      location.
fencing etc.


ASSET CLEARANCES AFTER COMPLETION OF WORKS
All Optus pits and manholes must be a minimum of 1 meter from the back of any kerb, 3.5 meters of the road surface
without a kerb or not within 15 meters of street intersection.

In urban areas Optus conduit must have the following minimum depth of cover:

•          Footway               600mm;

•          Roadway               1 meter at drain invert and at road centre crown.

In rural areas Optus conduit must have a minimum depth of cover of 1 meter and direct buried cable 1200mm.
In cases where it is considered that the above clearances cannot be maintained at the completion of works, advice
must be sought from the relevant Optus Damages and Relocations Team (refer “Further Assistance”).


FURTHER ASSISTANCE
Further assistance on asset clearances, protection works or relocation requirements can be obtained by contacting the
relevant Optus Damages and Relocations Team on the following email address:
[email protected]

Further assistance relating to asset location drawings etc. can be obtained by contacting the Optus Network
Operations Asset Analysis Team on 1800 505 777.

OPTUS ENGINEERING DRAWING SYMBOLS




Optus Dial Before You Dig Response – Negative V9                                                                      Page 3 of 3
Log in to download the original file

Searches.pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.