Skip to the record
Accept no imitations.

Council archive · source document

Attachment A - Code Assessment [As Published] · 132010.871

of 18

Text shows just the words. Original shows the document exactly as it was published.

    c) Roads are designed and constructed to satisfy their specified functions and provide an
       appropriate level of flood immunity (including local flooding on roads, i.e. through sufficient
       kerb storage capacity);
    d) Development provides appropriate buffering between noise sensitive uses and the major road
       network and rail corridors;
    e) Roads are designed and constructed to be compatible with the existing road network and
       hierarchy and to provide a safe environment for vehicular traffic, pedestrians and cyclists;
    f) Intersections and access points are designed and constructed to retain the low key
       development style and slower pace enjoyed by residents and visitors;
    g) Road and drainage infrastructure is constructed to a standard that minimizes ongoing
       maintenance costs;
    h) Drainage systems are designed and constructed with capacity to effectively manage or convey
       the design flow;
    i) Road and drainage infrastructure is compatible with other infrastructure; and j) Road and
       drainage infrastructure does not create any adverse impacts upon environmental values
       associated with biodiversity, hydrological cycles, biophysical resources and air quality.

Comment: The proposal will comply with all applicable Specific Outcomes/Probable Solutions of the
Transport Drainage and Works Code. This code will be addressed in greater detail as a component of
a subsequent operational works application.


WASTE MANAGEMENT CODE
A summary of the proposed development‘s compliance with the purpose of the Waste Management
Code is included below.

The purpose of this code is to ensure:

    a) The storage, disposal and management of solid and liquid waste are conducted in an safe and
       ecologically sustainable manner and without environmental nuisance;
    b) The on-site storage of waste does not create environmental nuisance or visual impact to
       adjoining property during the construction of a development; and
    c) Council and other licensed trade waste services are able to conveniently collect and dispose of
       waste generated by the development.

Comment: The proposal will comply with all applicable Specific Outcomes/Probable Solutions of the
Management Code. This code will be addressed in greater detail as a component of a subsequent
operational works application.


WATER SENSITIVE DESIGN CODE
A summary of the proposed development‘s compliance with the purpose of the Water Sensitive Design
Code is included below.

The purpose of this code is to ensure:

    a) all urban development has suitable treatment and reuse systems for all site run-off;
    b) all urban development reduces the need for mains water by utilizing run-off from appropriate
       areas for applications such as toilet flushing and garden maintenance;
    c) pipeless stormwater management systems are utilised;
    d) downstream ecosystems, properties and infrastructure are not adversely impacted by either
       quantity, levels of inundation or water quality changes caused by development; and
    e) water reuse facilities have no adverse impact on the quality of the town mains water.

Used in these records

About this file

File size
445 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment A - Code Assessment [As Published].pdf · 445 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.