J&P Richardson Industries Pty Ltd -5-
A margin of 20% should be added to the above values to allow for system load growth.
Final currents are 63A and 61A for F790 and F7298 respectively.
The range of variation in load over a typical summer day for 132kV F790 is shown in Figure
3 below.
Figure 3 F790 Daily Load curve 21/1/2020
AVE = 75.4
2.4 Scenarios for future development
2.4.1 Network connections
There is no indication that the circuit connections at 132kV (or 11kV feeders out of SSNVL)
are planned to be altered in the foreseeable future.
2.4.2 Load criteria
Magnetic field studies will be based on an average load calculation for each circuit (24hr
365day). An escalation of 20% has been applied to the average present day load to
account for future load growth.
Hollett Road EMF Study V1.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.