Original source · versioned page text
Attachment 13 - Code Assessment
Noosa Plan 2006 Planning Scheme Code Assessment
Table 14-24 For all Residential Uses
Performance Outcomes Acceptable Outcomes Comment
AND
S2.2 Buildings and structures (including swimming pools,
sheds, tennis courts or outbuildings) are not constructed
under overhead electricity transmission lines, or within
electricity easements;
AND
S2.3 A minimum separation distance is maintained from
the electricity transmission line to the closest boundary of
habitable buildings and child activity areas, as follows—
a) 20m for transmission lines up to 132kV;
b) 30m for transmission lines between 133kV and 275kV;
and
c) 40m for transmission lines greater than 275kV.
Water supply and conservation
O3 On-site water storage is designed and operated to S3.1 & S4.1 For a Class 1 building18 other than a Detached Not applicable. The proposed development will be
support the efficient use of water; house, outside a reticulated water service area, a connected by reticulated water services delivered through
AND rainwater tank is to be installed with the following
the construction of a new reticulated main from the north-
O4 On-site water storage is adequate for occupants every minimum storage capacities—
day use and fire fighting purposes. a) Where no more than 3 bedrooms – 45,000 litres; west of the development site to the site’s frontage.
or
b) Where more than 3 bedrooms – 60,000 litres;
AND
c) There is to be on the lot a dam, swimming pool
or water tank accessible for use by the fire
brigade that contains at least 5,000 litres of
water.
Erosion and sediment control
O5 Development does not cause erosion or No solution provided. Complies. Best practice erosion and sediment controls will
result in transport of sediments off-site. be installed to minimise the discharge of sediment laden
Editor’s note: run-off during construction. Further discussion of Erosion
Persons undertaking development, including building work, are and Sediment Control is provided within section 4.3.1 of
required under the Environmental Protection (Water) Policy 1997 the Engineering Services Report at Attachment 8.
(EPP) to ensure that sediment and other material including
building waste, sawdust, concrete, cement or paint are not
deposited or released into a roadside gutter, stormwater drain or
Page 12 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.