Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment 13 - Code Assessment

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Plan 2006 Planning Scheme Code Assessment


                                                                      Table 14-24 For all Residential Uses
 Performance Outcomes                                       Acceptable Outcomes                                                 Comment
                                                            AND
                                                            S2.2 Buildings and structures (including swimming pools,
                                                            sheds, tennis courts or outbuildings) are not constructed
                                                            under overhead electricity transmission lines, or within
                                                            electricity easements;
                                                            AND
                                                            S2.3 A minimum separation distance is maintained from
                                                            the electricity transmission line to the closest boundary of
                                                            habitable buildings and child activity areas, as follows—
                                                            a) 20m for transmission lines up to 132kV;
                                                            b) 30m for transmission lines between 133kV and 275kV;
                                                            and
                                                            c) 40m for transmission lines greater than 275kV.
 Water supply and conservation
 O3 On-site water storage is designed and operated to       S3.1 & S4.1 For a Class 1 building18 other than a Detached          Not applicable. The proposed development will be
 support the efficient use of water;                        house, outside a reticulated water service area, a                  connected by reticulated water services delivered through
 AND                                                        rainwater tank is to be installed with the following
                                                                                                                                the construction of a new reticulated main from the north-
 O4 On-site water storage is adequate for occupants every   minimum storage capacities—
 day use and fire fighting purposes.                            a) Where no more than 3 bedrooms – 45,000 litres;               west of the development site to the site’s frontage.
                                                                     or
                                                                b) Where more than 3 bedrooms – 60,000 litres;
                                                            AND
                                                                c) There is to be on the lot a dam, swimming pool
                                                                     or water tank accessible for use by the fire
                                                                     brigade that contains at least 5,000 litres of
                                                                     water.
 Erosion and sediment control
 O5 Development does not cause erosion or                   No solution provided.                                               Complies. Best practice erosion and sediment controls will
 result in transport of sediments off-site.                                                                                     be installed to minimise the discharge of sediment laden
                                                            Editor’s note:                                                      run-off during construction. Further discussion of Erosion
                                                            Persons undertaking development, including building work, are       and Sediment Control is provided within section 4.3.1 of
                                                            required under the Environmental Protection (Water) Policy 1997     the Engineering Services Report at Attachment 8.
                                                            (EPP) to ensure that sediment and other material including
                                                            building waste, sawdust, concrete, cement or paint are not
                                                            deposited or released into a roadside gutter, stormwater drain or

                                                                                   Page 12 of 26
Log in to download the original file

Attachment 13 - Code Assessment.pdf · 760 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.