Attachment 13 - Code Assessment
Performance outcomes Acceptable outcomes Response
Network impacts
PO20 Development does not result in a worsening of No acceptable outcome is prescribed. Complies. As detailed in the Traffic Engineering Report
operating conditions on the state-controlled road prepared by TTM Group and included at Attachment 9,
network. the proposed development will not result in a
worsening of operating conditions on the adjacent
Note: To demonstrate compliance with this state controlled road network.
performance outcome, it is recommended that an
RPEQ certified traffic impact assessment is provided,
prepared in accordance with the Guide to Traffic
Impact Assessment, Department of Transport and
Main Roads, 2017.
PO21 Development does not impose traffic loadings AO21.1 The layout and design of the development Not applicable. There is not alternate local road
on a state-controlled road which could be directs traffic generated by the development to the available to service the proposed development.
accommodated on the local road network. local road network.
PO22 Upgrade works on, or associated with, a state- AO22.1 Upgrade works required as a result of the Not applicable. The proposed development does not
controlled road are built in accordance with development are designed and constructed in trigger any required upgrade works to the adjacent
Queensland road design standards. accordance with the Road planning and design manual, state controlled road network.
2nd edition, Department of Transport and Main Roads,
2016.
Note: Road works in a state-controlled road require
approval under section 33 of the Transport
Infrastructure Act 1994 before the works commence.
Table 1.2.2: Environmental emissions
Performance outcomes Acceptable outcomes Response
Noise
Accommodation activities
PO23 Development involving an accommodation AO23.1 A noise barrier or earth mound is provided Complies. As detailed in the Acoustic Report prepared
activity or land for a future accommodation activity which is designed, sited and constructed: by Acousticworks and included at Attachment 7, the
minimises noise intrusion from a state-controlled road 1. to meet the following external noise criteria at proposed development will achieve compliance with
or type 1 multi-modal corridor in habitable rooms. all facades of the building envelope: acceptable noise levels by way of the provision of
Page 9 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.