Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Attachment 13 - Code Assessment

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                                 Acceptable outcomes                                      Response
                                                     AO10.3 Development does not obstruct pedestrian or
                                                     cyclist access to public passenger transport
                                                     infrastructure or public passenger services.
                                                     AND
                                                     AO10.4 The normal operation of public passenger
                                                     transport infrastructure or public passenger services is
                                                     not interrupted during construction of the
                                                     development.
Stormwater and drainage
PO11 Development does not result in an actionable No acceptable outcome is prescribed.                      Complies.     The proposed development is not
nuisance, or worsening of, stormwater, flooding or                                                          anticipated as causing any actionable nuisance to the
drainage impacts in a state transport corridor.                                                             adjacent state controlled road network.
PO12 Run-off from the development site is not AO12.1 Development does not create any new points             Complies. Run off to Myall Street / Nandroya Road as
unlawfully discharged to a state transport corridor. of discharge to a state transport corridor.            a consequence of the proposed development is not
                                                     AND                                                    anticipated.
                                                     AO12.2 Stormwater run-off is discharged to a lawful
                                                     point of discharge.

                                                         Note: Section 3.4 of the Queensland Urban Drainage
                                                         Manual, Department of Energy and Water Supply,
                                                         2013, provides further information on lawful points of
                                                         discharge.
                                                         AND
                                                         AO12.3 Development does not worsen the condition
                                                         of an existing lawful point of discharge to a state
                                                         transport corridor.
PO13 Run-off from the development site does not AO13.1 Run-off from the development site is not
cause siltation of stormwater infrastructure affecting a discharged to stormwater infrastructure for a state
state transport corridor.                                transport corridor.
Planned upgrades
PO14 Development does not impede delivery of AO14.1 Development is not located on land identified Not applicable. Planned upgrades of the adjacent state
planned upgrades of state transport infrastructure.      by the Department of Transport and Main Roads as transport infrastructure have not been identified.
                                                         land required for the planned upgrade of state
                                                         transport infrastructure.


                                                                                                                                          Page 18 of 23
Log in to download the original file

Attachment 13 - Code Assessment.pdf · 760 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.