Original source · versioned page text
2021-05-20 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 20 MAY 2021 8 CONSIDERATION OF COMMITTEE REPORTS 1 PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT – 11 MAY 2021 ATTENDANCE & APOLOGIES COUNCILLORS Cr Brian Stockwell (Chair) Cr Karen Finzel Cr Tom Wegener Cr Clare Stewart Cr Lorentson (non-Committee Councillor) EXECUTIVE B de Chastel, Chief Executive Officer A Dow, Acting Director Environment and Sustainable Development COMMITTEE RECOMMENDATIONS TO COUNCIL 1 OPW20/0114 PLANNING & ENVIRONMENT COURT APPEAL NO. D209 OF 2020 - REFUSAL OF AN APPLICATION FOR OPERATIONAL WORKS - JETTY AT 1/4 PORTSIDE CT, NOOSAVILLE That Council note the report by the Manager Development Assessment to the Planning & Environment Committee Meeting dated 11 May 2021 regarding Planning & Environment Court Appeal No. D209 of 2020 and agree to settle the appeal generally in accordance with the following conditions: Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 20.046 Sheet 1 of 2 E Site Plan prepared by Kunkel Building Design 6 August 2020 Sheets 20.046 Sheet 2 of 2 E Floor Plan, Floor Framing Plan & Typical Section 6 August 2020 Sheets prepared by Kunkel Building Design Currency Period 2. The development approval lapses if the works have not been completed and all conditions of approval been complied with by 20 May 2023, unless an application to extend the currency period is approved by Council. Site Specific Conditions 3. The approved plans must be certified by a suitably qualified Registered Professional Engineer of Queensland (RPEQ) as being suitable for the intended use prior to the commencement of construction. A copy of the certified plans must be submitted to Council for records purposes. 4. The Registered Professional Engineer of Queensland (RPEQ) bears full responsibility for all structural aspects of the jetty. General Conditions 5. All structures must be designed and constructed such that they are free standing within Page 4 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.