ORDINARY MEETING AGENDA                                                                 20 MAY 2021


          the waterway and are not connected to or behind the revetment wall.
    6.    All structures must have no detrimental effects on stormwater drains and/or easements.
    7.    Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of
          the revetment wall.
    8.    A rigid handrail must be fitted on one side of the walkway.
    9.    No posts or vertical supports of the proposed jetty are to extend vertically from the
          structure unless they provide necessary support for the handrail.
    10.   No boatlifting devices are to be attached or moored at the jetty structure for the purpose
          of elevating a vessel above the water without Council approval.
    11.   There must be no electrical reticulation system carrying electricity in excess of 24 volts
          beyond the revetment wall unless all switches and power outlets are positioned above
          the 1%AEP flood level.
    12.   Lighting associated with the use must be designed, installed, operated, and maintained
          in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
          Lighting.
    13.   Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
          5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
          a.    Located clear of this rock protection where applicable; or alternatively
          b.    Where the scour protection extends beyond 750mm:
                i.    Prior to driving piles, the rocks are to be removed to expose the geotextile
                      and the geotextile cut neatly to allow it to be turned back. During pile driving,
                      care is to be taken to ensure the geotextile is not damaged. At the completion
                      of pile driving, the fabric is to be turned down around the pile and the rocks
                      replaced around the piles
    14.   The jetty is to be used for private purposes only with no commercial operations to be
          undertaken.
    15.   Boat repair activities are not permitted on site.
    16.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
    17.   The mooring facility must not be utilised for live-aboard purposes, including short term
          accommodation.
    18.   Any construction and post construction activity is not to impact on the condition of the
          waterway, and is to be conducted so as not to breach the Environmental Protection Act
          EPA (1994) and the Environmental Protection (Water) Policy 2009.
    19.   Certification by a Registered Professional Engineer of Queensland that states that the
          jetty is constructed in accordance with best practice methods and is structurally sound
          must be submitted to Council. This certification must be submitted to Council within three
          (3) months of the completion of the works. A final inspection and approval of the structure
          by Council’s Inspector is also required. Please contact Council’s Development
          Assessment Branch on 5329 6500 to arrange the inspection.
    20.   After completion, the proposed works must be maintained in a sound state of repair in
          accordance with the approved plans
          Performance Bond
    21.   Security in the form of a cash bond or trading bank guarantee to the sum of $2500 must
          be submitted to Council, to secure performance of all conditions of this approval, prior to
          commencement of works. The cash bond or trading bank guarantee will be returned on
          performance of the conditions of approval less any costs incurred by Council in respect
          of enforcing performance of this permit. Council reserves the right to call upon the bond
          or guaranteed sum to effect compliance with conditions.

                                                                                        Page 5 of 18
Log in to download the original file

2021-05-20 Ordinary Meeting Agenda(PDF, 587KB).pdf · 601 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.