Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                       COMPLIANCE
 equipment for semi-submersible
 floating docks have a maximum
 height of 1100mm above the jetty
 floor.
 PO19                                      AO19.1                                            AO19.1                                         ☐Compliant
 Development is designed and               Jetties—                                          The proposal does not provide tidal works or   ☒N/A
 constructed for the sole purpose of       a) are a maximum width of 1.5 metres;             works in a watercourse.                        ☐Performance Solution
 providing access to vessels and are
                                           b) a maximum length of a jetty head is not
 sited and designed to avoid —
                                              more than 7 metres ;
 a) cluttering of waterways;
                                           c) constructed predominantly of timber;
 b) excessive traffic volumes within
                                           d) are not constructed parallel to the
    foreshore areas, on adjoining
                                              revetment wall; and extend a maximum
    lands and within the waterway;
                                              of 10 metres past the quayline.
    and
 c) unacceptable risks to personal
    and public safety                      AO19.2                                            AO19.2                                         ☐Compliant
                                           For “Y” and “T” shaped jetty heads or other       The proposal does not provide tidal works or   ☒N/A
                                           shaped jetty heads—                               works in a watercourse.                        ☐Performance Solution
                                               a) a maximum area of 10.5m²
                                                  excluding any walkway is provided;
                                                  and
                                               b) a walkway with a minimum length
                                                  of 3 metres is provided to the jetty
                                                  head.


                                           AO19.3                                            AO19.3                                         ☐Compliant
                                           Jetties have independent support structures       The proposal does not provide tidal works or   ☒N/A
                                           and are not supported by the revetment            works in a watercourse.                        ☐Performance Solution
                                           wall.




                                                     BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                                 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                              E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.