Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE equipment for semi-submersible floating docks have a maximum height of 1100mm above the jetty floor. PO19 AO19.1 AO19.1 ☐Compliant Development is designed and Jetties— The proposal does not provide tidal works or ☒N/A constructed for the sole purpose of a) are a maximum width of 1.5 metres; works in a watercourse. ☐Performance Solution providing access to vessels and are b) a maximum length of a jetty head is not sited and designed to avoid — more than 7 metres ; a) cluttering of waterways; c) constructed predominantly of timber; b) excessive traffic volumes within d) are not constructed parallel to the foreshore areas, on adjoining revetment wall; and extend a maximum lands and within the waterway; of 10 metres past the quayline. and c) unacceptable risks to personal and public safety AO19.2 AO19.2 ☐Compliant For “Y” and “T” shaped jetty heads or other The proposal does not provide tidal works or ☒N/A shaped jetty heads— works in a watercourse. ☐Performance Solution a) a maximum area of 10.5m² excluding any walkway is provided; and b) a walkway with a minimum length of 3 metres is provided to the jetty head. AO19.3 AO19.3 ☐Compliant Jetties have independent support structures The proposal does not provide tidal works or ☒N/A and are not supported by the revetment works in a watercourse. ☐Performance Solution wall. BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.