Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE AO19.4 AO19.4 ☐Compliant Seep holes in the revetment wall are not The proposal does not provide tidal works or ☒N/A obstructed by any jetty works in a watercourse. ☐Performance Solution AO19.5 AO19.5 ☐Compliant For lots comprising a dwelling house or dual The proposal does not provide tidal works or ☒N/A occupancy, a maximum of one jetty per works in a watercourse. ☐Performance Solution development is constructed. AO19.6 AO19.6 ☐Compliant Multiple dwellings with common property The proposal does not provide tidal works or ☒N/A along the waterway frontage meet the works in a watercourse. ☐Performance Solution following— a) a maximum of 2 jetties per multiple dwelling; b) jetties are shared between unit owners; c) a minimum of 20 metres separation is provided between each jetty; d) the jetty is setback a minimum of 3 metres from the prolongation of boundaries; and e) jetty heads and pontoons are not constructed AO19.7 AO19.7 ☐Compliant For multiple dwellings where each unit has The proposal does not provide tidal works or ☒N/A its own individual canal frontage— works in a watercourse. ☐Performance Solution BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.