Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                       COMPLIANCE
                                           AO19.4                                            AO19.4                                         ☐Compliant
                                           Seep holes in the revetment wall are not          The proposal does not provide tidal works or   ☒N/A
                                           obstructed by any jetty                           works in a watercourse.                        ☐Performance Solution


                                           AO19.5                                            AO19.5                                         ☐Compliant
                                           For lots comprising a dwelling house or dual      The proposal does not provide tidal works or   ☒N/A
                                           occupancy, a maximum of one jetty per             works in a watercourse.                        ☐Performance Solution
                                           development is constructed.


                                           AO19.6                                            AO19.6                                         ☐Compliant
                                           Multiple dwellings with common property           The proposal does not provide tidal works or   ☒N/A
                                           along the waterway frontage meet the              works in a watercourse.                        ☐Performance Solution
                                           following—
                                           a) a maximum of 2 jetties per multiple
                                                dwelling;
                                           b) jetties are shared between unit
                                                owners;
                                           c) a minimum of 20 metres separation is
                                              provided between each jetty;
                                           d) the jetty is setback a minimum of 3
                                              metres from the prolongation of
                                              boundaries; and
                                           e) jetty heads and pontoons are not
                                              constructed
                                           AO19.7                                            AO19.7                                         ☐Compliant
                                           For multiple dwellings where each unit has        The proposal does not provide tidal works or   ☒N/A
                                           its own individual canal frontage—                works in a watercourse.                        ☐Performance Solution




                                                     BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                                 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                              E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.