Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE PO3 AO3.1 AO3 Waste storage areas are located so that Waste storage areas are designed and The proposal does not provide a waste ☐Compliant they are convenient and safe to use maintained in accordance with Planning storage area for future development. ☒N/A and to collect from. Scheme Policy PSP9 Waste management. ☐Performance Solution AO3.2 AO3.2 Waste storage areas are designed and The proposal does not provide a waste ☐Compliant located so they: storage area for future development. ☒N/A a) are easily accessed and convenient to use; ☐Performance Solution b) have unobstructed access for the collection of the waste by service vehicles; c) without the need for manual handling; d) are clear of carparking bays, loading bays and similar areas; e) are clear of footpaths and pedestrian access; f) are capable of being serviced by the collection vehicle without impeding traffic flow; and g) have a level area provided for the storage of waste, recyclable materials and green waste in standard bins. AO3.3 AO3.3 For uses that do not employ a caretaker or The proposal does not provide new uses. ☐Compliant central management, the maximum ☒N/A BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.