Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE distance between waste storage areas and ☐Performance Solution the kerbside is 60 metres. AO3.4 AO3.4 Pathways used to transport bins: The proposal will support suitable transport ☒Compliant a) have a maximum grade of 1:15; and of bins for the lots. ☐N/A b) are free of steps, stairs or other ☐Performance Solution impediments. PO4 AO4.1 AO4.1 Waste storage areas are designed for Waste storage areas are constructed of The proposal does not provide a waste ☐Compliant ease of maintenance and ease impermeable and durable surfaces that are storage area for future development. ☒N/A of access for cleaning. easily cleaned. ☐Performance Solution AO4.2 AO4.2 Sufficient space is provided between and The proposal does not provide a waste ☐Compliant around waste storage bins to allow for storage area for future development. ☒N/A manoeuvring and washing of bins. ☐Performance Solution PO5 AO5 AO5 Waste storage areas provide a safe and No acceptable outcome provided The proposal does not provide a waste ☐Compliant secure environment for users through: storage area for future development. ☒N/A a) appropriate siting and access; ☐Performance Solution b) the provision of lighting; and c) restricting access to the general public by making the area clearly identifiable as private space. Water Management BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.