Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE PO6 AO6 AO6 Waste storage areas are designed to The waste storage area is constructed of The proposal does not provide a waste ☐Compliant contain and appropriately dispose of impermeable and durable surfaces and: storage area for future development. ☒N/A leakage from bins and wastewater a) is bunded and graded so that from bin washing. washwater and bin leakage are drained ☐Performance Solution to the sewer or an on-site effluent disposal system via a gully within the storage area; b) has a bund wall with a maximum height of 100 millimetres; c) is serviced by a conveniently located hosecock and backflow prevention device, and connected to a water supply; and d) is roofed or otherwise covered if the storage area is— (i) more than 1m²; or (ii) storing wet waste; or (iii) storing other waste with a high potential to cause pollution if washed or leaked from the bins, including waste oil or putrescibles. Safety and protection of infrastructure when demolishing or removing buildings PO7 AO7.1 AO7.1 Demolition, removal, relocation or Infrastructure including reticulated water, The proposal will ensure safety and ☒Compliant associated works do not result in: sewerage, stormwater, and electricity are protection of infrastructure when ☐N/A protected from damage and made safe to demolishing or removing buildings. ☐Performance Solution BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.