Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                COMPLIANCE
 PO6                                       AO6                                               AO6
 Waste storage areas are designed to       The waste storage area is constructed of          The proposal does not provide a waste   ☐Compliant
 contain and appropriately dispose of      impermeable and durable surfaces and:             storage area for future development.    ☒N/A
 leakage from bins and wastewater          a) is bunded and graded so that
 from bin washing.                            washwater and bin leakage are drained                                                  ☐Performance Solution
                                              to the sewer or an on-site effluent
                                              disposal system via a gully within the
                                              storage area;
                                           b) has a bund wall with a maximum height
                                              of 100 millimetres;
                                           c) is serviced by a conveniently located
                                              hosecock and backflow prevention
                                              device, and connected to a water
                                              supply; and
                                           d) is roofed or otherwise covered if the
                                              storage area is—
                                               (i)   more than 1m²; or
                                               (ii) storing wet waste; or
                                               (iii) storing other waste with a high
                                                     potential to cause pollution if
                                                     washed or leaked from the bins,
                                                     including waste oil or putrescibles.
 Safety and protection of infrastructure when demolishing or removing buildings
 PO7                                       AO7.1                                             AO7.1
 Demolition, removal, relocation or        Infrastructure including reticulated water,       The proposal will ensure safety and     ☒Compliant
 associated works do not result in:        sewerage, stormwater, and electricity are         protection of infrastructure when       ☐N/A
                                           protected from damage and made safe to            demolishing or removing buildings.
                                                                                                                                     ☐Performance Solution



                                                   BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                               NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                            E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.