Skip to the record
Search everything, all in one place.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                        ACCEPTABLE OUTCOMES                              PROPOSAL                            COMPLIANCE
      and integrate with the landscape and   AO20.2                                           AO20.2
      skyline.                               On sloping sites or on ridgelines at the         The proposal does not provide new   ☐Compliant
                                             uppermost edge of a hill slope:                  buildings.                          ☒N/A
                                             a) roof lines are generally parallel with
                                                contours of the land;                                                             ☐Performance Solution
                                             b) roofs do not exceed a pitch of 15
                                                degrees;
                                             c) buildings do not protrude above the
                                                height of prevailing vegetation; and
                                             d) undercroft areas exceeding 1.5 metres
                                                in height are screened with
                                                landscaping or battens.


                                             AO20.3                                           AO20.3
                                             On sloping sites slab on ground                  The proposal does not provide new   ☐Compliant
                                             construction is avoided to minimise              buildings.                          ☒N/A
                                             building bulk and benching of the site.
                                             Split-level buildings with small floorplates                                         ☐Performance Solution
                                             are used as an alternative. Post and beam
                                             construction or suspended floor or pole
                                             footings may be appropriate.
                                             AO20.4                                           AO20.4
                                             Buildings:                                       The proposal does not provide new   ☐Compliant
                                             a) are constructed in lightweight                buildings.                          ☒N/A
                                                materials such as timber or board,
                                                stainless steel, glass and corrugated                                             ☐Performance Solution
                                                iron;




                                                  BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                              NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                           E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.