Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE and integrate with the landscape and AO20.2 AO20.2 skyline. On sloping sites or on ridgelines at the The proposal does not provide new ☐Compliant uppermost edge of a hill slope: buildings. ☒N/A a) roof lines are generally parallel with contours of the land; ☐Performance Solution b) roofs do not exceed a pitch of 15 degrees; c) buildings do not protrude above the height of prevailing vegetation; and d) undercroft areas exceeding 1.5 metres in height are screened with landscaping or battens. AO20.3 AO20.3 On sloping sites slab on ground The proposal does not provide new ☐Compliant construction is avoided to minimise buildings. ☒N/A building bulk and benching of the site. Split-level buildings with small floorplates ☐Performance Solution are used as an alternative. Post and beam construction or suspended floor or pole footings may be appropriate. AO20.4 AO20.4 Buildings: The proposal does not provide new ☐Compliant a) are constructed in lightweight buildings. ☒N/A materials such as timber or board, stainless steel, glass and corrugated ☐Performance Solution iron; BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.