Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE b) are finished with exterior colours of moderate to darker shades of olive green, brown, green, blue, charcoal or wood stains that blend with the colour and hues of the surrounding vegetation and landscape; c) avoid large expanses of solid colours or reflective surfaces. Earthworks and drainage PO21 AO21 AO21 Filling and excavation for operational Filling and excavation for operation works Any proposed earthworks and drainage ☒Compliant works do not directly, indirectly or are designed and constructed to ensure will be suitably designed in operational ☐N/A cumulatively cause adverse impacts overland flow and/or flooding is not works in accordance with the relevant external to the development site by: worsened, impeded, or otherwise diverted requirements. ☐Performance Solution a) causing ponding of water on the site to adversely affect other properties or or nearby land; downstream environments. b) increasing flooding, which adversely affects the safety or use of any land upstream or downstream; or c) adversely affecting the flow of water in any overland flow path. BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.