Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                       ACCEPTABLE OUTCOMES                              PROPOSAL                                   COMPLIANCE
                                            b) are finished with exterior colours of
                                               moderate to darker shades of olive
                                               green, brown, green, blue, charcoal or
                                               wood stains that blend with the colour
                                               and hues of the surrounding
                                               vegetation and landscape;
                                            c) avoid large expanses of solid colours or
                                               reflective surfaces.


 Earthworks and drainage
 PO21                                       AO21                                             AO21
 Filling and excavation for operational     Filling and excavation for operation works       Any proposed earthworks and drainage       ☒Compliant
 works do not directly, indirectly or       are designed and constructed to ensure           will be suitably designed in operational   ☐N/A
 cumulatively cause adverse impacts         overland flow and/or flooding is not             works in accordance with the relevant
 external to the development site by:       worsened, impeded, or otherwise diverted         requirements.                              ☐Performance Solution
 a) causing ponding of water on the site    to adversely affect other properties or
    or nearby land;                         downstream                   environments.
 b) increasing flooding, which adversely
    affects the safety or use of any land
    upstream or downstream; or
 c) adversely affecting the flow of water
    in any overland flow path.




                                                 BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                             NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                          E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.