Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN 2.3 Existing Services Code 2.3.1 Purpose PURPOSE & OVERALL OUTCOMES PROPOSAL COMPLIANCE 1) The purpose of the Existing Services Code is to ensure existing underground infrastructure is protected from damage caused by development. 2) The overall outcomes sought for the Existing services code are: a) Underground infrastructure is accessible for maintenance purposes. ☒Compliant The proposed development will not impact existing underground b) Existing services are identified and methods of protection ☐N/A infrastructure. and access are implemented in the design of the ☐Performance Solution development. 2.3.2 Performance Outcomes & Acceptable Outcomes PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE Assessable development PO1 AO1 AO1 Development near a stormwater drain, No acceptable outcome provided The proposal will not adversely impact and ☒Compliant overland flow path or associated suitably utilise the stormwater drainage ☐N/A structure does not— infrastructure for the site and development. ☐Performance Solution BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.